High voltage parts water removal: during the humid season, there is moisture on the connecting
cable of the transformer (the high voltage unit), transformer, and the connecting cables of the ozone
module. Dry it with cloth and hair dryer. Otherwise, it may lead to damage to the equipment.
●
Ozone module inner chamber, discharge tube cleaning/ replacement: accumulate small partial on
the inner chamber and electrode from the gas source will lower the ozone production and
concentration. Hence, they need to be cleaned regularly.
MAINTENANCE CYCLE TABLE
Item
Content
Circle
Remark
day week
month
Three
month
Half year
One
year
Two
year
Three
year
Fan filter net
Clean,
replace
○
●
Cycling clean
Dry moisture on
high voltage
parts
Clean
○
Maintain during
humid season
Inner side of
internal and
external
electrode
Clean
○
Regular clean
when used in
beverage and
food industry
Internal
electrode
Replace
●
Replace if high
demanded
External
electrode
Replace
●
Replace if high
demanded
Fault detection
circuit board
Replace
●
Replace if high
demanded
Transformer
(high voltage
unit)
Replace
●
Replace if high
demanded
Note
●
○
:
means inspection, adjust or clean;●
:
means replacement
●
The above table is the suggested maintenance/ replacement cycle from manufacturer and customer
can also conduct the maintenance/replacement according the actual operation environment and
intensity of work
●
All maintenance/replacement can only be conducted when the power is off and pressure release,
ensuring the safety of the operation personnel.
13
Содержание AQUAZONE 200G
Страница 8: ...7...
Страница 10: ...200G 400G AND 600G INTERFACE TWO SETS MODULAR DESIGN 9...
Страница 11: ...4 20MA ANALOG SIGNAL RECEIVING PORT 10...
Страница 17: ...CONTACT US 16...