●
During operation, the equipment generates high voltage. Hence, it is prohibited to open the
equipment control panel and power control cabinet.
●
There is a safety breaker in the front enclosure, and when the front enclosure of the equipment is
open. The equipment will stop working automatically. Hence, it is forbidden to open the front
enclosure during operation.
●
The equipment should be equipped with a dedicated electrical distribution cabinet, and proper
grounding device.
●
The equipment comes with operation instruction, and the operation personnel should be trained
before operation.
SAFETY NOTE
●
Make sure input and output pipes are connected correctly. Incorrect connection will lead to leakage
or damage of the equipment.
●
Equipment should be installed with enough space for better heat dissipation and maintenance.
●
Do not use any damaged parts, otherwise it may lead to accidents or damage to the equipment.
●
During installation or operation, make sure no ozone leakage and the wiring cable size meets the
requirement, in order to avoid fire risk.
●
To move the equipment, it is required to be guided by professionals.
●
The equipment is water-cooling, and the heat will need to be dissipated out of the equipment in time.
Hence, the equipment room has to be in good ventilation and install an exhaust fan if necessary. The
ambient humidity must not be higher than 90%, otherwise, there will be water drops inside the
equipment causing electricity leakage or fire.
●
Incorrect wiring will lead to electrical parts damaged or even dangerous.
●
Users must not change electrical cables or power connectors unless authorised.
OPERATION NOTES AND MAINTENANCE
●
Do not rinse the equipment.
●
Do not clean the equipment with hot water higher than 60
℃
, which may cause deformation or colour
fading.
●
Volatile solution or organic solvent must not be used; otherwise it may damage the equipment
surface.
●
Clean the ozone module inner chamber and discharge tubes carefully by soft cloth moistened with
alcohol every year (very important)!
●
The power source should be disconnected during the non-operation period.
●
Make sure the inlet and outlet valves are closed during the non-operation period.
●
Make sure the valves are working normally, and filters with regular maintenance.
●
Keep the ambient area clean, dry, with a ventilation device installed.
●
Do not damage the wiring cable, otherwise it will cause electric shock.
●
Do not use flammable spray material to spray on the equipment, which may cause fire.
●
Inlet or outlet must not be blocked; otherwise equipment performance will be lowered and out of
order! Do not put sticks or other things to the inlet or outlet! Otherwise, it may touch the electric
components and cause danger!
3
Содержание AQUAZONE 200G
Страница 8: ...7...
Страница 10: ...200G 400G AND 600G INTERFACE TWO SETS MODULAR DESIGN 9...
Страница 11: ...4 20MA ANALOG SIGNAL RECEIVING PORT 10...
Страница 17: ...CONTACT US 16...