background image

ATOMLAB™ 500, ATOMLAB™ 500PLUS DOSE 
CALIBRATOR, and ATOMLAB™ WIPE TEST 
COUNTER 

 

Installation Guide  

 

086-330 

086-331 

086-332 

086-336 

075-594 

 

 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 Note: 

For a full Atomlab 500 or Wipe Test Counter Operation and 

Service manual, please go to www.biodex.com/support/manuals.  

  

 
 
 

 

 

FN: 17-353 Rev A  9/17 

Содержание 075-594

Страница 1: ...RATOR and ATOMLAB WIPE TEST COUNTER Installation Guide 086 330 086 331 086 332 086 336 075 594 Note For a full Atomlab 500 or Wipe Test Counter Operation and Service manual please go to www biodex com...

Страница 2: ...1 General Requirements for Safety conforms to UL 60601 1 CAN CSA C22 2 No 601 1 M90 IEC 60601 1 IEC 60601 1 4 and IEC 60601 1 2 and CE Marked FDA Class II Equipment EC Certificate EC 4132458 Type B Ap...

Страница 3: ...ey Road Shirley New York 11967 4704 Tel 800 224 6339 Int l 631 924 9000 Fax 631 924 8355 email supportservices biodex com www biodex com Service and Technical Support For Installation questions contac...

Страница 4: ...the following products Atomlab 500 Atomlab 500Plus Wipe Test Counter Unpacking the Atomlab Open the lighter carton containing the Tablet Interface Module Cables and manual The components are packaged...

Страница 5: ...f the USB Cable 1 into the Tablet and the other end into the Interface Module Plug the power connector of Cable 2 into the Tablet Plug the other end into the power strip making sure the power strip ha...

Страница 6: ...tor Detector as illustrated in the circular inset at the bottom of Figure 4 Connect the two sections of Cable 5 by plugging the cable into the power transformer see Figure 4 Place the power connector...

Страница 7: ...ht of Figure 5 and the other end into the Label Printer as illustrated in the circular inset at the top left of Figure 5 Connect the two sections of Cable 7 by plugging the cable into the power transf...

Страница 8: ...nto the Report Printer as illustrated in the circular inset at the top left of Figure 6 Connect the two sections of Cable 9 by plugging the cable into the power transformer Place the power connector e...

Страница 9: ...e Interface Module as illustrated in the circular inset at the upper left of Figure 7 making sure that the open port is used Plug the other end of the RJ 12 Cable into the Dose Calibrator Detector as...

Страница 10: ...transformer see Figure 8 Place the power connector end of Cable 5 into the Interface Module as illustrated in the circular inset at the upper left of Figure 8 Place the other end of the power cable in...

Страница 11: ...top center of Figure 9 and the other end into the Label Printer as illustrated in the circular inset at the top left of Figure 9 Connect the two sections of Cable 7 by plugging the cable into the pow...

Страница 12: ...r end into the Report Printer as illustrated in the circular inset at the top left of Figure 10 Connect the two sections of Cable 9 by plugging the cable into the power transformer Place the power con...

Страница 13: ...the Wipe Chamber as illustrated in the circular inset at the bottom right of Figure 11 Connect the two sections of Cable 5 by plugging the cable into the power transformer see Figure 11 Place the powe...

Страница 14: ...2 and the other end into the Report Printer as illustrated in the circular inset at the top left of Figure 12 Connect the two sections of Cable 9 by plugging the cable into the power transformer Place...

Страница 15: ...y pressing the power switch on the tablet The Atomlab500 application software automatically runs when the tablet starts up The Main Menu is displayed If the Main Menu is not displayed after the tablet...

Страница 16: ...16 Biodex Medical Systems Inc 2017...

Отзывы: