ASSURANCE
GDS®
PPMX
USER
MANUAL
35
Appendix
G
Pack
Up
1.
Unplug
the
Assurance
GDS
PPMX,
place
the
black
power
supply
in
the
mini
white
cardboard
box
and
put
into
the
accessories
box.
2.
Unplug
the
control
tablet
or
laptop,
place
the
black
USB
cable/ferrite
cores
in
their
plastic
bag
and
put
into
the
open
‐
ended
accessories
box.
3.
Place
control
tablet/laptop
and
charger
back
into
the
labeled
computer
box
and
put
into
the
open
‐
ended
accessories
box.
4.
Place
the
control
tablet
holder
(if
applicable)
in
its
labeled
box
and
put
into
the
accessories
box.
5.
Place
all
the
deck
accessories
into
their
respective
plastic
bags
and
place
into
the
accessories
box.
a.
Trash
bin,
tip
reload
racks,
tip
puck,
reagent
holder
and
power
cords
(US
&
EU)
in
large
plastic
bag
b.
Place
gel
block
in
its
mini
white
box
c.
Dispose
of
used
reservoirs,
sample
wells
and
tips
6.
Secure
the
back
by
installing
the
shipping
brace
onto
the
rear
of
the
instrument
with
thumb
screws.
7.
Remove
the
8x200
Pipette
Head
by
unscrewing
the
thumb
nuts
securing
it
to
the
left
side
of
the
arm.
Wrap
the
Pipette
Head
in
bubble
wrap
and
place
in
the
labeled
manila
envelope
holding
the
Alignment
Head
–
place
in
accessories
box.
Accessories
box
Open
‐
ended
accessories
box