UF V (E2+E2.1) 03/2013
page 38/112
4.4
10 mm access port prepared to be finalized by the user (UF V (E2.1), UF V-
UL (E2.1))
The UF V (E2.1) is equipped with an access port to be finalized by the user for cables with a diameter of
up to 10 mm. When finalizing this access port the freezer should be approx. at room temperature.
CAUTION
Works inside the UF V with low inside temperature.
Danger of injury by freezing on.
Turn off the freezer prior to finalizing the access port an let it warm up until approx.
room temperature.
To finalize the access port proceed as follows:
•
Break out the pre-punched rectangle in the rear wall (Figure 20) with suitable pliers
•
Break out the pre-punched rectangle in the inner chamber (Figure 21) with suitable pliers
•
Use a screwdriver to pierce the PU foam insulation horizontally from the inside
•
Pass the desired cables through the port
•
Use the sealing kit (art. no. 8009-0815) for sealing. The included insulation tube is to close the
remaining free space after passing the cables. Thoroughly seal both openings of the port with the
sealant. This avoids the entry of humidity from the ambient air into the insulation.
Figure 20: Rear view UF V (E2.1) with pre-punched access port
Figure 21: Inner chamber UF V (E2.1) with pre-punched access port
Содержание 9020-0213
Страница 6: ...UF V E2 E2 1 03 2013 page 6 112...
Страница 7: ...UF V E2 E2 1 03 2013 page 7 112 Product registration...
Страница 104: ...UF V E2 E2 1 03 2013 page 104 112 18 7 Dimensions UF V 500 E2 xxx Indications in mm...
Страница 105: ...UF V E2 E2 1 03 2013 page 105 112 18 8 Dimensions UF V 500 E2 1 xxx Indications in mm...
Страница 106: ...UF V E2 E2 1 03 2013 page 106 112 18 9 Dimensions UF V 700 E2 1 xxx Indications in mm...
Страница 113: ......