Step

6

Continue adding the floor board (internally) making 

sure to interlock each board. Do NOT secure these 

boards until the last board has been measured and 

cut. 

Tools

Step

5

Place the first floor board inside the building flush to 

the log board on one side. Fix the first board in place 

using 30mm nails. 

Tools

Step

7

To fix the last floor board. Measure the gap between 

the bottom of the tongue (on the last board placed) 

and the log board. Using a straight edge mark out the 

measurement onto the last board and cut to fit. 

Tools

Step

9

Once you have assembled the floor, slide the assembled 

window frame over the boards, resting the frame on top of 

the log board. Ensure this is level and is sitting straight. The 

middle support may or may not be pre attached, if not it will 

be attached later.

Tools

Step

8

Following the same method as shown in stages 5, 6 

and 7 continue to affix the floor boards for the 

opposite side of the cabin. Note: Review your 

technical document to check floor board lengths.  

Tools

Step

4

Build up the cabin wall boards another 4 layers, 

ensuring you complete each layer. Use a mallet and a 

spare piece of packing wood to make sure all of the 

boards are flush, level and fully inserted.

Содержание Mia 19351

Страница 1: ...y and retain for future reference Kybotech Claylands Avenue Worksop S81 7BQ 01909 768858 Adult assembly only Minimum 2 people 4 6 Hours building time based on building size and experience CE certi ed...

Страница 2: ...01909 768840...

Страница 3: ...01909 768840...

Страница 4: ......

Страница 5: ...01909 768840...

Страница 6: ...01909 768840...

Страница 7: ...2 Once the outer frame is assembled place the remaining oor bearers as shown ensuring they are equally spaced Fix into position with 50mm screws Pilot Drilling Holes Pilot drill all screw holes to av...

Страница 8: ...board and cut to t Tools Step 9 Once you have assembled the oor slide the assembled window frame over the boards resting the frame on top of the log board Ensure this is level and is sitting straight...

Страница 9: ...the cabin followed by the full length front wall board Note Review your technical document to check the gable boards used Tools Step 13 Place the nal gable board as shown whilst xing in place with 50m...

Страница 10: ...6 Lay the purlins into the slots on the front and rear of the building Screw these in place using 50mm screws by screwing through the board into the purlin on the front and back Please see the technic...

Страница 11: ...hinge in the locations marked Af x in place with 30mm screws Tools Step 23 Once you have af xed the door frame on the side of the opening slide the upper frame into position as shown Once in position...

Страница 12: ...you place two hinges on the top edge with 30mm screws Tools Step 30 Following the process in stage 28 carefully place the glazing into the window frames and x the glazing beading with 30mm nails Tools...

Страница 13: ...or frame opening edges Place the door rebates as shown and x in place with 30mm nails Review the technical document for measurements to cut the rebate to size Tools Step 36 Once complete x the window...

Страница 14: ...of and x into place using 30mm nails making sure to nail through the fascia into the log boards Ensure the felt fold behind the fascia board Tools Step 43 Fold the front of the felt down and line up t...

Страница 15: ...for you to leave a review at billyoh com and send us pictures of your fully assembled building to billyohcom on Instagram If for whatever reason you are not satis ed with your purchase you have any qu...

Отзывы: