background image

Tools

Step

34

Once the lower window is complete. Fix the upper 

window frame into position by fixing the hinges as 

shown. Screw into position with 30mm screws. 

Please ensure the window is level before securing.

Tools

Step

35

To secure the edges around the window frame, 

place the window rebates as shown, fix in place 

using 30mm nails. 

Review the technical document 

for measurements to cut the rebate to size.  

Tools

Step

37

With the windows and door fixed in place correctly, now 

seal the edges of the door frame opening edges. Place the 

door rebates as shown and fix in place with 30mm nails. 

Review the technical document for measurements to cut 

the rebate to size. 

Tools

Step

36

Once complete, fix the window casement in the 

centre of the window frame, fix in place with 30mm 

screws.  

Tools

Step

38

To fix the door barrel bolts to the top and bottom of 

the door frame, using 30mm screws fix as shown, 

whilst using a 28x28mm framing piece to secure the 

top barrel bolt lock correctly into position. 

Tools

Step

39

To begin to fix the felt to your cabin, cut the felt into 

four pieces. Ensuring that for every piece of felt you 

cut, you apply an additional 140mm to fold around 

the edges of the purlis. 

Top

Bottom

x 3

Содержание Mia 19351

Страница 1: ...y and retain for future reference Kybotech Claylands Avenue Worksop S81 7BQ 01909 768858 Adult assembly only Minimum 2 people 4 6 Hours building time based on building size and experience CE certi ed...

Страница 2: ...01909 768840...

Страница 3: ...01909 768840...

Страница 4: ......

Страница 5: ...01909 768840...

Страница 6: ...01909 768840...

Страница 7: ...2 Once the outer frame is assembled place the remaining oor bearers as shown ensuring they are equally spaced Fix into position with 50mm screws Pilot Drilling Holes Pilot drill all screw holes to av...

Страница 8: ...board and cut to t Tools Step 9 Once you have assembled the oor slide the assembled window frame over the boards resting the frame on top of the log board Ensure this is level and is sitting straight...

Страница 9: ...the cabin followed by the full length front wall board Note Review your technical document to check the gable boards used Tools Step 13 Place the nal gable board as shown whilst xing in place with 50m...

Страница 10: ...6 Lay the purlins into the slots on the front and rear of the building Screw these in place using 50mm screws by screwing through the board into the purlin on the front and back Please see the technic...

Страница 11: ...hinge in the locations marked Af x in place with 30mm screws Tools Step 23 Once you have af xed the door frame on the side of the opening slide the upper frame into position as shown Once in position...

Страница 12: ...you place two hinges on the top edge with 30mm screws Tools Step 30 Following the process in stage 28 carefully place the glazing into the window frames and x the glazing beading with 30mm nails Tools...

Страница 13: ...or frame opening edges Place the door rebates as shown and x in place with 30mm nails Review the technical document for measurements to cut the rebate to size Tools Step 36 Once complete x the window...

Страница 14: ...of and x into place using 30mm nails making sure to nail through the fascia into the log boards Ensure the felt fold behind the fascia board Tools Step 43 Fold the front of the felt down and line up t...

Страница 15: ...for you to leave a review at billyoh com and send us pictures of your fully assembled building to billyohcom on Instagram If for whatever reason you are not satis ed with your purchase you have any qu...

Отзывы: