background image

Tools

Step

28

Place the glazing into the door frame as shown, once 

in position, use cardboard to protect the glazing when 

fitting the beading around the edges of the glazing. 

Fix the beading in place with 30mm nails. 

Tools

Step

29

Once the glazing is fixed into position, affix the door 

hinges onto the door frame with 30mm screws. Once 

complete, affix door handle as shown, using 30mm 

screws.

Tools

Step

31

Fix the window opening hinges onto the top frame of 

the window. Ensuring you place two hinges on the 

top edge with 30mm screws.

Tools

Step

30

Following the process in stage 28, carefully place the 

glazing into the window frames and fix the glazing 

beading with 30mm nails.

Tools

Step

32

Place the smaller window frame into the frame as shown, 

ensuring the frame support beam sits on top of the window  

frame. To secure the frame support beam in place, screw in 

place with 30mm screws (if not already secured). Once 

affixed, fix the window frame with 30mm screws. 

Tools

Step

33

To secure the edges around the window frame, place 

the window rebates as shown, fix in place using 

30mm nails. Review the technical document for 

measurements to cut the rebate to size.  

Содержание Mia 19351

Страница 1: ...y and retain for future reference Kybotech Claylands Avenue Worksop S81 7BQ 01909 768858 Adult assembly only Minimum 2 people 4 6 Hours building time based on building size and experience CE certi ed...

Страница 2: ...01909 768840...

Страница 3: ...01909 768840...

Страница 4: ......

Страница 5: ...01909 768840...

Страница 6: ...01909 768840...

Страница 7: ...2 Once the outer frame is assembled place the remaining oor bearers as shown ensuring they are equally spaced Fix into position with 50mm screws Pilot Drilling Holes Pilot drill all screw holes to av...

Страница 8: ...board and cut to t Tools Step 9 Once you have assembled the oor slide the assembled window frame over the boards resting the frame on top of the log board Ensure this is level and is sitting straight...

Страница 9: ...the cabin followed by the full length front wall board Note Review your technical document to check the gable boards used Tools Step 13 Place the nal gable board as shown whilst xing in place with 50m...

Страница 10: ...6 Lay the purlins into the slots on the front and rear of the building Screw these in place using 50mm screws by screwing through the board into the purlin on the front and back Please see the technic...

Страница 11: ...hinge in the locations marked Af x in place with 30mm screws Tools Step 23 Once you have af xed the door frame on the side of the opening slide the upper frame into position as shown Once in position...

Страница 12: ...you place two hinges on the top edge with 30mm screws Tools Step 30 Following the process in stage 28 carefully place the glazing into the window frames and x the glazing beading with 30mm nails Tools...

Страница 13: ...or frame opening edges Place the door rebates as shown and x in place with 30mm nails Review the technical document for measurements to cut the rebate to size Tools Step 36 Once complete x the window...

Страница 14: ...of and x into place using 30mm nails making sure to nail through the fascia into the log boards Ensure the felt fold behind the fascia board Tools Step 43 Fold the front of the felt down and line up t...

Страница 15: ...for you to leave a review at billyoh com and send us pictures of your fully assembled building to billyohcom on Instagram If for whatever reason you are not satis ed with your purchase you have any qu...

Отзывы: