Field Crew Supervisor and facility manager are to walk-thru completed installation.
The installation is complete and on time in accordance with original Check-In document. If not, explain:
Conduit runs accepted and installed in accordance with Check-In document, Scope of Work, and Layout. If not, explain:
Fan placement correct in accordance with both the Check-In document, Scope of Work, and Layout. If not, explain:
Breaker size and wire type correct in accordance with the Check-In document, Scope of Work, and Layout. If not, explain:
All Safety Rules and Regulations met in accordance with the Check-In document, Scope of Work, and Layout. If not, explain:
Fans have been running for over an hour and operate without visible defect or issue.
The fan is spinning in the correct direction (counter-clockwise when viewed from floor).
Angle iron is securely fastened and is without any apparent problems in accordance with installation techniques discussed at
check-in.
If extension tube is 4 ft (1.2 m) or longer, guy wires are in place and there is no evidence of a wobble.
Supervisor has supplied and explained the Installation Guide. If not, explain:
The supervisor has explained and I understand how to operate fan including starting/stopping, speed operation, and power
disconnect. If not, explain:
Time in/out and duration are in accordance with Check-In document:
Additional comments:
Close-Out Procedure
(for Big Ass Fan Certified Installers Only)
2425 Merchant Street
Lexington, KY 40511
Phone: 1-877-BIG-FANS
Fax: (859) 967-1695
www.bigassfans.com
Company:
Job Name:
Address:
City/State/ZIP:
Contact Name:
Phone:
E-mail:
Customer
Signature:
Contractor
Signature:
Printed Name:
Printed Name:
The supervisor is to hold all documents until the job is complete, and then send all forms back to Field Service Manager. This will
consist of the service/work order, Check-In document, and Close-Out document. The installation crew will not receive payment until all
forms are signed by the facility manager and the supervisor. These documents will then be forwarded to the Field Service Manager at
Big Ass Fans.
Содержание 8'-24' Powerfoil X
Страница 1: ...8 24 Powerfoil X INSTALLATION GUIDE...
Страница 53: ...47 WWW BIGASSFANS COM 2011 DELTA T CORP DBA BIG ASS FAN CO ALL RIGHTS RESERVED 8 24 POWERFOIL X Notes...
Страница 55: ......
Страница 63: ......
Страница 65: ......
Страница 67: ......
Страница 68: ......
Страница 69: ......
Страница 70: ......
Страница 71: ......
Страница 72: ...170511 REV B 2425 Merchant Street Lexington KY 40511 1 877 BIG FANS 1001120101...