4
September 2020
Installation, Operation and Maintenance Manual
MAN 571_EAC Rev. 1
Installation
Section 2: Installation
2.1
Checks Upon Actuator Receipt
•
Check that the model, the serial number of the actuator and the technical data
reported on the identification plate correspond with those of order confirmation
(Section 1.2).
•
Check that the actuator is equipped with the fittings as provided for by
order confirmation.
•
Check that the actuator was not damaged during transportation: if necessary
renovate the painting according to the specification reported on the
order confirmation.
•
If the actuator is received already assembled with the valve, its settings have
already been made at the factory.
•
If the actuator is delivered separately from the valve, it is necessary to check, and,
if required, to adjust, the settings of the mechanical stops (Section 3.4) and of
micro-switches (if any) (Section 3.5).
2.2
Actuator Handling
NOTICE
The lifting and handling should be made by qualified staff and in compliance with the laws
and provisions in force.
!
WARNING
The fastening points are appropriate for the lifting of the actuator alone and not for the
valve+actuator assembly. Avoid that during the handling, the actuator passes above the
staff. The actuator should be handled with appropriate lifting means. The weight of the
actuator is reported on the delivery bill.
Section 2: Installation