Installation schematic for BigE walk-in tub
for STRAIGHT WALL installation
PREPARE THE DRAIN.
MIN. 5" x 5" HOLE FOR
DRAIN PIPE
FINAL DRAIN-
AND HOT/COLD
CONNECTION
MAGNET
CHECK THAT
THE TUB IS LEVEL
FINAL
INSTALLATION
PREPARING
THE TUB
INSTALL THE VALVE ROUGH-IN
(UNLESS FACTORY INSTALLED)
INSTALL THE WASTE/OVERFLOW
AND DOOR DRAIN FITTING THROUGH
THE PLUMBING ACCESS PANEL IN THE
FRONT OR THROUGH THE OPEN BACK
15"
ACCESS PANELS MAY BE REMOVED TO PREVENT DAMAGE AND MAKE HANDLING DURING INSTALLATION MORE CONVENIENT.
MAKE SURE TO KEEP THEM IN A SAFE PLACE TO AVOID DAMAGE, AS THEY WILL NEED TO BE REATTACHED AFTER FINAL INSTALLATION.
1
2
2
1
3
ATTACH THE CABLE/LANYARD
TO MAGNET SCREW AND NUT
TO MEET CODE
4
SCREW BACK NAILING
FLANGE TO THE STUDS
2
6"
PREPARE THE HOT AND
COLD WATER SUPPLY
LEVEL THE FLOOR TO ENSURE THAT
ALL FIVE LEVELING FEET WILL TOUCH
1
3
4
42"
12"
PREPARING
THE AREA
FRONT VIEW DETAIL
TOP VIEW DETAIL
10"
5-1/2"
MUST ELEVATE
1-1/2" OFF OF
FINISHED FLOOR
12" TO BACK WALL
42"
TO PLBG END
POWER SUPPLY
PLACEMENT DETAILS
USA - 120V/15A GFCI
OUTLETS REQUIRED IN
THIS AREA
CANADA - 120V/15A GFCI
OUTLET OR JUNCTION
BOX IN THIS AREA PER
CSA CODE C22.2 No. 218.2