Section 11 Service Instructions
101
11.5.3 Checking the Crystal-Multiplier Assembly
Faults in the crystal-multiplier assembly are indicated by the pla-
teau becoming too small or too steep. They can often be detected
through visual inspection.
To do this, take the crystal-multiplier assembly apart. Proceed as
follows:
o
Switch off the scintillation counter before opening the
instrument.
o
Do not perform the check in bright daylight, as this may
damage the photocathode of the photomultiplier.
o
Open the scintillation counter by removing the cover of
the connection box first and then the screws of the
socket. The entire electronics (1) with the
crystal/multiplier combination can then be detached
from the housing.
o
Remove the photomultiplier combination from the
socket (2) and unscrew the ring nut (3) on the front
panel. The multiplier (4) including crystal (5) can now
be detached from the Mu-metal shielding (6).
o
There is a thin layer of silicone oil between crystal and
multiplier to ensure optical coupling; silicone oil is
rather viscous, particularly at low temperatures.
Carefully detach the crystal from the multiplier window
by gently sliding the crystal sideways.
Do not wipe off
the silicone oil!
o
Check:
The
crystal
must be perfectly clear inside and not show
any dull areas. The normal coloring is slightly greenish.
A yellowish to brownish coloring is a sign of thermal
overload and indicates that the crystal must be re-
placed. The surrounding white reflecting layer must not
be damaged. You can only check the photomultiplier for
glass breakage or other mechanical damages. Other
faults cannot be identified by visual checks alone.
However, if the crystal does not show any faults, a bad
plateau indicates that the photomultiplier is faulty.
Figure 33: Scintillation counter
1 = Electronics part with (a) CPU,
(b) HV, (c) voltage divider
2 = Base
3 = Ring nut
4 = Photomultiplier
5 = Crystal
6 = Mu-metal shielding
(a)
(b)
(c)
Содержание LB 442
Страница 1: ...Radiometric Bulk Flow Meter LB 442 Id No 32815BA2 Rev Nr 02 10 10 2001...
Страница 2: ......
Страница 117: ...Section 13 Appendix 115 Section 13 Appendix 13 1 Certificates 13 1 1 ATEX Certificate for Evaluation Unit...
Страница 118: ...13 1 Certificates 116...
Страница 119: ...Section 13 Appendix 117...
Страница 120: ...13 1 Certificates 118...
Страница 121: ...Section 13 Appendix 119...
Страница 122: ...13 1 Certificates 120 13 1 2 ATEX Certificate for Detector...
Страница 123: ...Section 13 Appendix 121...
Страница 124: ...13 1 Certificates 122...
Страница 125: ...Section 13 Appendix 123...
Страница 126: ...13 1 Certificates 124 13 1 3 ATEX Certificate for Wall Housing...
Страница 127: ...Section 13 Appendix 125...
Страница 128: ...13 1 Certificates 126...
Страница 129: ...Section 13 Appendix 127 13 1 4 Declaration of Conformance...
Страница 132: ...13 3 Tachometer Installation 130 13 3 Tachometer Installation...
Страница 133: ...Section 13 Appendix 131...
Страница 134: ...13 3 Tachometer Installation 132 13 3 1 Tachometer...
Страница 138: ...13 4 Mechanical Drawings 136 13 4 4 Free Fall Measurement...
Страница 139: ...Section 13 Appendix 137 13 4 5 Point Detector...
Страница 145: ...Section 13 Appendix 143 13 4 11 Evaluation Unit...
Страница 148: ...13 5 Wiring Diagram 146 13 5 3 19 Frame...