![Berthold LB 442 Скачать руководство пользователя страница 72](http://html1.mh-extra.com/html/berthold/lb-442/lb-442_operating-manual_2739261072.webp)
7.2 Tare Measurement
70
The external tare measurement can also be interrupted or contin-
ued again by pressing the <
run
> button.
Current Output during Tare Measurement
During tare measurement the current output (26a/26c) does not
supply any current (0 mA).
Manual Input of the Tare Count Rate
You may also enter the tare count rate manually. Confirm you en-
try with <
enter
>.
Verification and Correction of the Tare Measurement
Check whether the tare value is correct by running the belt without
load for several minutes. During measurement, watch how the
value in the tonnage memory changes. If this change is too big,
you have to repeat tare measurement.
7.2.2 Tare Compensation
All changes occurring in the course of time have to be compen-
sated for by a tare measurement. This includes changes of the
conveyor belt, for example replacement of belts or chains links.
Tare must also be determined again when the belt has been re-
placed. Recalibration is not necessary.
The same applies if the source is replaced after several years.
If a tare measurement is performed after calibration, all count
rates of the calibration points are converted in accordance with the
new calculated tare count rate. As a result, the calibration curve
remains unchanged, even if it is calculated again with these val-
ues.
Therefore, a tare measurement can be carried out any time and
used for correction of the calibration.
Furthermore, one or several calibration points can be added any
time. When adding calibration points, the calibration curve has to
be calculated new (see next section).
Содержание LB 442
Страница 1: ...Radiometric Bulk Flow Meter LB 442 Id No 32815BA2 Rev Nr 02 10 10 2001...
Страница 2: ......
Страница 117: ...Section 13 Appendix 115 Section 13 Appendix 13 1 Certificates 13 1 1 ATEX Certificate for Evaluation Unit...
Страница 118: ...13 1 Certificates 116...
Страница 119: ...Section 13 Appendix 117...
Страница 120: ...13 1 Certificates 118...
Страница 121: ...Section 13 Appendix 119...
Страница 122: ...13 1 Certificates 120 13 1 2 ATEX Certificate for Detector...
Страница 123: ...Section 13 Appendix 121...
Страница 124: ...13 1 Certificates 122...
Страница 125: ...Section 13 Appendix 123...
Страница 126: ...13 1 Certificates 124 13 1 3 ATEX Certificate for Wall Housing...
Страница 127: ...Section 13 Appendix 125...
Страница 128: ...13 1 Certificates 126...
Страница 129: ...Section 13 Appendix 127 13 1 4 Declaration of Conformance...
Страница 132: ...13 3 Tachometer Installation 130 13 3 Tachometer Installation...
Страница 133: ...Section 13 Appendix 131...
Страница 134: ...13 3 Tachometer Installation 132 13 3 1 Tachometer...
Страница 138: ...13 4 Mechanical Drawings 136 13 4 4 Free Fall Measurement...
Страница 139: ...Section 13 Appendix 137 13 4 5 Point Detector...
Страница 145: ...Section 13 Appendix 143 13 4 11 Evaluation Unit...
Страница 148: ...13 5 Wiring Diagram 146 13 5 3 19 Frame...