4
Before You Start / EPA
1-2
A typical installation of the
NITE Phoenix
generally takes between 8 to 10 hours,
although your particular situation may vary.
This manual contains step-by- step installation
instructions. It is divided into three categories:
●
General installation
●
Electrical installation
●
Heater installation (optional)
There is also a section on how to check your
NITE Phoenix
to make sure the installation
was successful, and a section on how to
operate your
NITE Phoenix
.
If relocation or reinstallation of any pre-
installed equipment is necessary for
installation of the NITE Phoenix equipment -
please refer to the components manufacturer's
instructions or safety guidelines for proper
installation.
Before you start, we highly recommend doing
the following to help make your installation as
easy as possible.
1.
Lay out all parts and check to make sure you
have all parts listed on the parts list.
Depending on truck, some hardware may
not be used.
If you are missing any parts,
please call 1-866-204-8570.
2.
To prevent damage to compressor, keep the
NITE Phoenix
unit in an upright position at all
times. If unit is tipped, place back in upright
position for a minimum of 6 hours prior to
running.
3.
Check the list of tools needed for installation
and make sure you have all of them. Keep all
tools within easy reach.
4.
Look through the whole installation manual to
get an understanding of the order in which
components are installed.
5.
Make sure you have good lighting and
enough space to work in.
6.
You may want to get an assistant to help
you to reduce the number of times you have
to climb in and out of the cab.
7.
Make sure you wear all appropriate safety
equipment
Photo above is representative of kit
1000230792 only.
Содержание NITE Kenworth T680
Страница 8: ...8 1 6 Before You Start EPA...
Страница 9: ...9 1 7 Cardboard Template Layout Unit Exploded View...
Страница 23: ...23 Section 2 Electrical Installation...
Страница 41: ...41 2 18 Electrical Installation...
Страница 45: ...45 Section 3 ESPAR Fuel Operated Heater Installation...
Страница 59: ...59 New Phoenix wiring for units built from 6 26 2017 to current 4 2 Wiring Diagrams...
Страница 60: ...60 Use for units manufactured from 2 08 2012 to 6 26 2017 4 3 Wiring Diagrams...
Страница 61: ...61 Use for units manufactured from 2 08 2012 to 6 26 2017 4 4 Wiring Diagrams...
Страница 62: ...62 Use for units manufactured prior to 2 08 2012 4 5 Wiring Diagrams...
Страница 63: ...63 Use for units manufactured prior to 2 08 2012 4 6 Wiring Diagrams...
Страница 64: ...64 Section 5 Operating Instructions...
Страница 68: ...68 Section 6 Battery Management System BMS Installation...
Страница 69: ...69 6 1 Bergstrom NITE System BMS 100 Installation Battery Management...
Страница 70: ...70 6 2 Battery Management...
Страница 71: ...71 6 3 Battery Management...