Electrical Installation
25
A
2-2
Steel Battery Box Installation
Locate the battery box on the frame as close as possible to the sleeper
NITE Phoenix unit. When positioning the box, always keep the top of the
box as close to the top of the frame rail as possible
–
Some
manufacturers recommend no drilling within 2″ of top or bottom of frame
rail. Check truck manufacturer guidelines prior to drilling.
Using box as
template, mark and drill a minimum of 4 holes. Always use the holes in
the rear outer corner area where you have double walled steel. Of the 3
holes available on each side of the outer most edge of box, choose the
top and center holes on each side (see photo A). Drill frame rail using ½″
HS bit. Install box with ½″ grade 8 bolts and hardware provided. Tighten
securely.
Attach the Hold-down Brackets
Set two batteries side-by-side in the battery box and place a hold-down
bracket on top with the u-
channel facing up. Take two 5/16” bolts, place a
5/16” flat washer on each and then put the bolts through the outer holes.
Tighten each bolt securely from underneath using the supplied nuts and
washers. Repeat the procedure for the other two batteries.
Electrical Installation
Correct
Incorrect
2
1
Содержание NITE Kenworth T680
Страница 8: ...8 1 6 Before You Start EPA...
Страница 9: ...9 1 7 Cardboard Template Layout Unit Exploded View...
Страница 23: ...23 Section 2 Electrical Installation...
Страница 41: ...41 2 18 Electrical Installation...
Страница 45: ...45 Section 3 ESPAR Fuel Operated Heater Installation...
Страница 59: ...59 New Phoenix wiring for units built from 6 26 2017 to current 4 2 Wiring Diagrams...
Страница 60: ...60 Use for units manufactured from 2 08 2012 to 6 26 2017 4 3 Wiring Diagrams...
Страница 61: ...61 Use for units manufactured from 2 08 2012 to 6 26 2017 4 4 Wiring Diagrams...
Страница 62: ...62 Use for units manufactured prior to 2 08 2012 4 5 Wiring Diagrams...
Страница 63: ...63 Use for units manufactured prior to 2 08 2012 4 6 Wiring Diagrams...
Страница 64: ...64 Section 5 Operating Instructions...
Страница 68: ...68 Section 6 Battery Management System BMS Installation...
Страница 69: ...69 6 1 Bergstrom NITE System BMS 100 Installation Battery Management...
Страница 70: ...70 6 2 Battery Management...
Страница 71: ...71 6 3 Battery Management...