21
1-19
Installation Procedures
Rear as it
is installed
in the truck
Bottom as
it is
installed in
the truck
Rear as it
is installed
in the truck
Top of duct as it is installed
in the truck
Top of duct as it is installed
in the truck
Using the Dimensions From the Drawing
Mark 1 hole on each side closer to the top
of the OE duct. Make sure the holes are
20.4 mm from the top side of the duct and
50 mm from the rear edge. Dimension of
the pivot holes are 6 mm.
Door Stop: Measure 56.5 mm on the
Bottom
of the OE duct from rear edge and
mark center of the duct. Center from side to
side should be approximate 62 mm. Drill
one 4.75 mm hole and install the stop
button in the hole. This button will sit behind
the door and prevent it from opening while
the Phoenix unit is operating.
36
37
Содержание NITE Kenworth T680
Страница 8: ...8 1 6 Before You Start EPA...
Страница 9: ...9 1 7 Cardboard Template Layout Unit Exploded View...
Страница 23: ...23 Section 2 Electrical Installation...
Страница 41: ...41 2 18 Electrical Installation...
Страница 45: ...45 Section 3 ESPAR Fuel Operated Heater Installation...
Страница 59: ...59 New Phoenix wiring for units built from 6 26 2017 to current 4 2 Wiring Diagrams...
Страница 60: ...60 Use for units manufactured from 2 08 2012 to 6 26 2017 4 3 Wiring Diagrams...
Страница 61: ...61 Use for units manufactured from 2 08 2012 to 6 26 2017 4 4 Wiring Diagrams...
Страница 62: ...62 Use for units manufactured prior to 2 08 2012 4 5 Wiring Diagrams...
Страница 63: ...63 Use for units manufactured prior to 2 08 2012 4 6 Wiring Diagrams...
Страница 64: ...64 Section 5 Operating Instructions...
Страница 68: ...68 Section 6 Battery Management System BMS Installation...
Страница 69: ...69 6 1 Bergstrom NITE System BMS 100 Installation Battery Management...
Страница 70: ...70 6 2 Battery Management...
Страница 71: ...71 6 3 Battery Management...