1
Installation Manual
Kenworth T680
without factory installed heater
For Phoenix Gen 4 units built after 6/26/2017
2390 Blackhawk Road ● Rockford, IL 61109 ●
● 1-866-204-8570
The information contained herein is proprietary to Bergstrom Inc and/or its subsidiaries shall
not be reproduced, copied, or disclosed in whole or in part, or used for manufacture or any
other purpose, without prior written permission of Bergstrom Inc. The only controlled version
is that viewed electronically on the designated Bergstrom intranet site.
Содержание NITE Kenworth T680
Страница 8: ...8 1 6 Before You Start EPA...
Страница 9: ...9 1 7 Cardboard Template Layout Unit Exploded View...
Страница 23: ...23 Section 2 Electrical Installation...
Страница 41: ...41 2 18 Electrical Installation...
Страница 45: ...45 Section 3 ESPAR Fuel Operated Heater Installation...
Страница 59: ...59 New Phoenix wiring for units built from 6 26 2017 to current 4 2 Wiring Diagrams...
Страница 60: ...60 Use for units manufactured from 2 08 2012 to 6 26 2017 4 3 Wiring Diagrams...
Страница 61: ...61 Use for units manufactured from 2 08 2012 to 6 26 2017 4 4 Wiring Diagrams...
Страница 62: ...62 Use for units manufactured prior to 2 08 2012 4 5 Wiring Diagrams...
Страница 63: ...63 Use for units manufactured prior to 2 08 2012 4 6 Wiring Diagrams...
Страница 64: ...64 Section 5 Operating Instructions...
Страница 68: ...68 Section 6 Battery Management System BMS Installation...
Страница 69: ...69 6 1 Bergstrom NITE System BMS 100 Installation Battery Management...
Страница 70: ...70 6 2 Battery Management...
Страница 71: ...71 6 3 Battery Management...