8.1 Maintenance instructions
Thanks to its simple, though robust design, the
EasyKit
requires little regular maintenance. In
order to guarantee efficient and problem-free operation, the maintenance schedule below
should be strictly observed. Repairs and maintenance activities should be recorded in the
maintenance logbook - see appendix 1. The employer is also responsible for periodically
checking tools and equipment according to the current Working Equipment Guidelines that
cover this.
Maintenance - Checks
Tools
Day
Week
Month
Year
Cleaning
Brush
X
Sufficiently charged battery
Users schedule
X
X
Damage to operating components
Visual
X
Damage to/visibility of pictograms & stickers
Visual
X
Foot pedal + platform cleaning
Brush / damp cloth
X
Cleaning control panel
Brush / damp cloth
X
Check for leaks from battery and damaged
cables
Visual
X
Check for ingrained dirt or string around
wheels and chains
Visual
X
Charge batteries
Battery charger
X
General mechanical damage
Visual
X
Check battery fluid levels (1 cm fluid
covering plates - see appendix 4)
Distilled water, gloves,
screwdriver (+), goggles
X
Check operation of tilt warning
Testing > 2 degrees
X
grease swivel wheels, drive chain and
bearings
Bearing grease, chain grease
or other universal lubricants
X
Check chain tension (see 8.5)
Ring key
X
Maintenance carbon brushes on the motor
and replace if less than 1 cm (see 8.4)
Visual & Air pressure
X
Check the height adjuster locks
visual
X
Test the springs in the locks
visual
X
Figure 4: Maintenance schedule
If the checks above indicate that there is a fault with the
EasyKit
, immediate contact should
be made with the Berg Hortimotive dealer. Continuing to use the machine after identifying
defects could lead to dangerous situations and is therefore forbidden!
8.2 Specialist maintenance
Maintenance and repairs to the items listed below may only be carried out by qualified
specialists recognised by Berg Products BV:
-
Repairs to the electrical components/wiring (excluding exchanging foot pedals and
batteries).
-
All activities to the drive unit (excluding cleaning, readjusting or replacing the chain or
chain sprockets).
-
For activities that can be carried out by the owner please consult
http://www.berghortimotive.com/service/bsa-film
for the BSA films.
8.3 Pipe rail system maintenance
The pipe rail system on which the
EasyKit
runs should be checked on a regular basis. The
system should always satisfy the Horticulture Sector Guidelines for Pipe Rail Systems in
greenhouses. It is prohibited to use the
EasyKit
on a pipe rail system that does not satisfy
these guidelines.
Always ensure that the pipe rails are sufficiently supported at a maximum distance of 1.25 m
for 51 pipes and at 1 metre for 45 pipes, and that the supports are not distorted and the pipes
are properly secured (clamped). Moreover, the pipes on the concrete path should be secured