![Beretta POWER MAX 100 Скачать руководство пользователя страница 31](http://html.mh-extra.com/html/beretta/power-max-100/power-max-100_installation-and-operation-manual_2736679031.webp)
31
Electrical wiring referred to layout 2 at page "19"
MO1
BUS 2
BUS 1
PWM
SE
SB
SS
24 V
0-10V
TA
3
4
9 10 11 12 13 14 15 16 17
5 6 7 8
TA
SB
PB
MO2
PI
PB
L
N
L
L
N
101 102 103 104 105 106
TA
Room/heat demand thermostat
SB
Connect to the storage cylinder probe (Mod.
San. 1) or to the storage cylinder thermostat
(Mod. San. 2)
PB
Connect to the deviating valve (13). Contacts 101-
102 control the deviation on heating, contacts 102-
103 control the deviation on domestic hot water
NOTE
The room thermostat connection must be dry (no voltage).
Electrical wiring referred to layout 3 at page "20"
MO1
BUS 2
BUS 1
PWM
SE
SB
SS
24 V
0-10V
TA
3
4
9 10 11 12 13 14 15 16 17
5 6 7 8
TA
PI
MO2
PI
PC (PS)
(ACS)
PB
L
N
L
L
L
N
L
N
101 102 103 104 105 106 107 108 109
TA
Room/heat demand thermostat
PI
Connect to the high temperature system pump
NOTE
The room thermostat connection must be dry (no voltage).
Electrical wiring referred to layout 4 at page "20"
MO1
BUS 2
BUS 1
PWM
SE
SB
SS
24 V
0-10V
TA
3
4
9 10 11 12 13 14 15 16 17
5 6 7 8
TA
SB
PB
PI
MO2
PI
(ACS)
PB
L
N
L
L
N
L
101 102 103 104 105 106
TA
Room/heat demand thermostat
SB
Connect to the storage cylinder probe (Mod.
San. 1) or to the storage cylinder thermostat
(Mod. San. 2)
PB
Connect to the water pump
PI
Connect to the high temperature system pump
NOTE
The room thermostat connection must be dry (no voltage).
Electrical wiring referred to layout 5 at page "21"
MO1
BUS 2
BUS 1
PWM
SE
SB
SS
24 V
0-10V
TA
3
4
9 10 11 12 13 14 15 16 17
5 6 7 8
TA
SB
PB
PI
MO2
PI
(ACS)
PB
L
N
L
L
N
L
101 102 103 104 105 106
TA
Room/heat demand thermostat
SB
Connect to the storage cylinder probe (Mod.
San. 1) or to the storage cylinder thermostat
(Mod. San. 2)
PB
Connect to the deviating valve (13). Contacts
101-102 control the deviation on heating, con-
tacts 102-103 control the deviation on domestic
hot water
PI
Connect to the high temperature system pump
NOTE
The room thermostat connection must be dry (no voltage).
b
Some electric connections of the power jig have a
double function. With special reference to the princi-
ple schemes 2 and 5 where no tank pump is foreseen,
the two-way valve of each module must be connect-
ed to the abovementioned connections 101-102-103.
Содержание POWER MAX 100
Страница 58: ...SYSTEM MANAGER 58 ...
Страница 59: ...SYSTEM MANAGER 59 ...