background image

Installation and Operation Manual

   

Storage cylinder

IDRA MS

Installation and Operation Manual

EN

   

Содержание IDRA MS 150

Страница 1: ...Installation and Operation Manual Storage cylinder IDRA MS Installation and Operation Manual EN ...

Страница 2: ... improper installation adjustment maintenance or use b The product must be serviced at least once a year Servicing must be arranged in advance with the B Technical Assistance Centre b All servicing and repairs must be performed by a qualified heating engineer b If water leaks from the storage cylinder turn off the water supply and contact B s Technical Assis tance Centre or a qualified heating eng...

Страница 3: ...for easy cleaning and mainte nance of the anti corrosion magnesium anode 4 IDENTIFICATION The B IDRA MS solar heaters can be identified by Data plate This lists the technical specifications and performance of the product BALLON Modele Model Fabrication Année bar W l W kW l h BOLLITORE Modello Codice Matricola Anno m2 kW T067774IFE T067774IFE BOILER Year Serial number V Hz Potenza elettrica assorbi...

Страница 4: ...DHW 10 45 C at the different coil inlet temperatures and with the indicated delta T Coil delivery temperature 80 C T 20 C 27 kW 660 l h 70 C T 20 C 19 kW 480 l h 60 C T 10 C 11 kW 280 l h 50 C T 10 C 8 kW 190 l h Set up time required to heat the boiler to 60 C coil probe point reference with primary exchanger at the indi cated delivery temperature and with the indicated delta T Coil delivery tempe...

Страница 5: ...oil probe point reference and pri mary exchanger at the indicated delivery temperature considering an increase of the domestic water tempera ture of 30 C between inlet and outlet according to EN 12897 Coil delivery temperature 60 C 223 l Quantity of domestic water obtained in 10 with boiler pre heated to 45 C coil probe point reference and pri mary exchanger at the indicated delivery temperature c...

Страница 6: ...NISATION When installing B IDRA MS storage cylinders in old sys tems or systems requiring modernisation always perform the following checks Make sure that the system is fitted with safety and control devices in accordance with applicable legis lation and standards Make sure that the central heating circuit has been flushed out to remove all sludge and lime scale and has been vented and seal tested...

Страница 7: ... 33 300 mm DF Flange internal diameter 130 mm A 171 mm B 243 mm C 323 mm D 431 mm E 523 mm F 663 mm G 920 mm H 1088 mm I 604 mm L M8 threaded inserts for grounding point accessory handles connection 700 mm b We recommend that you install isolating valves in the outlet and return lines b Check the efficiency of the seals when filling refilling the storage cylinder b In case of a probe any electric ...

Страница 8: ...ricity supply ON at the mains power switch and at control panel switch if fitted 14 TEMPORARY SHUTDOWN To reduce to the environmental impact and save energy in case of brief absences week ends short trips etc and with external temperatures above 0 C set the heater tem perature control where available to the minimum value b If the temperature to which the heater is exposed can fall below 0 C frost ...

Отзывы: