Beretta 20072002 Скачать руководство пользователя страница 18

 

18

3  WATER IN CENTRAL HEATING 

SYSTEMS

INTRODUCTION

Water used in central heating systems MUST be suitably 

treated to ensure the correct functioning of those systems 

and to guarantee an extended working life for boilers and 

all other system components. This applies not only to exist-

ing systems but to newly installed systems too.

Sludge, lime-scale and pollutants present in the water can 

cause permanent damage to the heating unit, also within 

a short time and regardless of the quality standards of the 

materials used.

Contact the Technical Assistance Centre for any further in-

formation on type and use of additives.

Always conform to the standards and legislation ap-

plicable in the country of installation.

WATER IN CENTRAL HEATING SYSTEMS.
INSTRUCTIONS FOR THE DESIGN, INSTALLATION AND 
MANAGEMENT OF CENTRAL HEATING SYSTEMS.

1. Chemical and physical characteristics of water

The chemical and physical characteristics of water used in 

central heating systems must conform to the requirements 

of EN 14868 standard and to the following tables:

STEEL BOILERS

with furnace power  < 150 kW

Initial filling 

water

Regular ser-

vice water  

(*)

ph

6-8

7,5-9,5

Hardness

°fH

< 10°

< 10°

Electrical 

conductivity

μs/cm

< 150

Chlorides

mg/l

< 20

Sulphides

mg/l

< 20

Nitrides

mg/l

< 20

Iron

mg/l

< 0,5

STEEL BOILERS

with furnace power  > 150 kW

Initial filling 

water

Regular ser-

vice water  

(*)

ph

6-8

7,5-9,5

Hardness

°fH

< 5°

< 5°

Electrical 

conductivity

μs/cm

< 100

Chlorides

mg/l

< 10

Sulphides

mg/l

< 10

Nitrides

mg/l

< 10

Iron

mg/l

< 0,5

(*) values for water in system after 8 weeks of functioning

General note on water used to top up systems:

-  If softened water is used to top up a system, 8 weeks 

of functioning after topping up, verify that the water in 

the system respects the above limits, in particular for 

electrical conductivity

-  This check is not necessary if demineralised water is 

used to top up the system.

2. Central heating systems

Do not use automatic filling devices to add water to 

central heating systems. Use a manual device in-

stead and record top-ups in the system service book.

If there are more than one boiler, they must all be put 

into service either contemporarily or with a very low 

rotation time during the initial period of service, so as 

to evenly distribute the limited quantity of initial lime-

scale.

A flushing cycle must be programmed after the plant 

has been installed to flush out any installation debris.

Water used to fill a system for the first time and water 

used to top it up must always be filtered (using syn-

thetic or metal mesh filters with a filtration rating of no 

less than 50 microns) to prevent sludge from forming 

and triggering deposit corrosion.

The heating system must be flushed out and cleaned 

with good workmanship before filling up the existing 

systems. The boiler may not be filled until after the 

heating system has been flushed out.

2.1 New central heating systems

The system must be filled up slowly the first time; once it is 

filled and the air expelled it should never need to be topped 

up again.

Systems should also be operated at maximum working 

temperature the first time they are started up, in order to 

facilitate de-aeration. (Gas is not released from the water at 

low temperatures).

2.2 Reconditioning old central heating systems

If a boiler has to be replaced, do not refill the entire cen-

tral heating circuit if the quality of water in it conforms to 

requirements. If the quality of water fails to conform to re-

quirements, either recondition the old water or separate the 

water circuits (water in the boiler circuit must conform to 

requirements).

3. Corrosion

3.1 Deposit corrosion

Under-deposit corrosion is an electrochemical process, 

due to the presence of sand, rust, etc., inside the mass 

of water. These solid substances generally deposit on the 

bottom of the boiler (sludge), on tube and pipe heads or in 

the gaps between pipes and tubes.

Micro-corrosion phenomena may be triggered off owing 

to the difference in electrochemical potential coming to be 

created between the material in contact with the impurity 

and the surrounding one.

Содержание 20072002

Страница 1: ...Installation Manual CONDENSING THERMAL MODULES Power Plus Box Installation Manual EN...

Страница 2: ...ta CONFORMITY The Power Plus Box SE modular condensing systems com ply with Directive 2009 142 EC Gas Appliances Directive 92 42 EEC on efficiency requirements and Annex E and Pres Republic Decree n 4...

Страница 3: ...FORMATION 4 1 1 General Safety Information 4 1 2 Precautions 4 1 3 Description of the appliance 5 1 4 Safety devices 5 1 5 Identification 6 1 6 System layout 6 1 7 Coupling configuration 8 1 8 Technic...

Страница 4: ...n densing system at least once a year b This manual is an integral part of the equipment and therefore must be stored carefully and must ALWAYS accompany the modular condensing system even if it is so...

Страница 5: ...er pressure switch and an electronic safety system that controls a delivery sensor and a return sensor The equipment is protected if there is no water or in the case of insufficient circulation Safety...

Страница 6: ...akes any installation and maintenance operation difficult and invalidates the warranty 1 6 System layout 1 Control panel 2 Single heating element 3 Instrument panel 4 Pressure gauge 5 Fuel shut off co...

Страница 7: ...SET On Error RESET On Error 5 5 bar 1 3 2 4 5 6 7 30 8 9 10 31 11 14 15 16 17 19 20 21 10 13 22 43 45 41 46 10 13 47 48 23 24 25 26 27 28 29 18 13 12 32 33 36 37 38 34 35 39 40 42 44 50 51 52 53 54 55...

Страница 8: ...PLUS BOX SE SZ2 VM SB PZ1 PB SE PZ2 SZ1 SZ1 Delivery manifold sensor SZ2 Low system temperature sensor SB Boiler sensor SE Outdoor sensor PZ1 Zone 1 circulator high temperature PZ2 Zone 2 circulator l...

Страница 9: ...loss Tm 70 C 0 5 Flue gas temperature Return temperature 2 5 C max 80 C C CO2 at minimum 9 0 G20 10 4 G30 31 CO2 at maximum 9 0 G20 10 4 G30 31 CO S A at minimum maximum less than 11 91 mg kWh Weight...

Страница 10: ...is outlet 12 Gas valve 13 Gas cock 14 Safety cock 5 4 bar 15 Water flow manifold 16 Water return manifold 17 Hydraulic separator 18 Drain cock 19 Shut off cock 20 High temperature flow fitting 21 Low...

Страница 11: ...70 95 1108 18 61568 1 26135 20 12090 39 6033 58 3216 77 1817 96 1079 17 58719 2 25044 21 11634 40 5828 59 3116 78 1766 97 1051 16 56016 3 24004 22 11199 41 5630 60 3021 79 1717 98 1024 15 53452 4 2301...

Страница 12: ...tr remoto 24V contr remoto Comune Analogic Input Comune T A circ 1 Comune T A circ 2 2 Comune 4 J1 PC BARCODE NTC climatica J11 11 Comune NTC mand circ 2 NTC mand circ 1 Comune Comune NTC bollitore Co...

Страница 13: ...ne Sens Hall Termostato limite Valvola gas 2 1 3 a 9 m J16 NTC fumi J9 J4 a 10 WD J5 T3 PC Main IG SLAVE 2 3 C TS VG SR SF EA ER J10 J17 a m 13 Pressostato Diff PD Circolatore C Circolatore Bus line w...

Страница 14: ...ranty certificate Barcode labels 6 Accessory envelope containing Natural gas to LPG transformation kit valid for Eu rope Door key The following is also supplied positioned on the base inside the modul...

Страница 15: ...N Power Plus Box 100 SE System side connections MI1 High temperature flow manifold 3 MI2 Low temperature flow manifold 3 RI1 High temperature return manifold 3 RI2 Low temperature return manifold 3 IG...

Страница 16: ...ries installation of the modules keeping the following in mind the hydraulic and gas connections must be made on the right side of the control unit when standing in front of the two systems prepare th...

Страница 17: ...16 17 16 POWER PLUS BOX POWER PLUS BOX SE 1 Flue gas exhaust manifold connection 2 Drain 3 Power Plus Box modular system 4 Power Plus Box SE modular system 5 Manifold delivery sensor trap 6 Gas shut o...

Страница 18: ...to add water to central heating systems Use a manual device in stead and record top ups in the system service book b If there are more than one boiler they must all be put into service either contemp...

Страница 19: ...is therefore important to avoid two factors possibly leading to the above mentioned pro cesses i e contact between air and water in the installation and regular topping up with fresh water To elimina...

Страница 20: ...20...

Страница 21: ...21...

Страница 22: ...22...

Страница 23: ...23...

Страница 24: ...oilers com Beretta reserves the right to modify the characteristics and specifications given in this publication at any time and without prior notice as part of its policy of continuous product improv...

Отзывы: