
16
2 4 Installation premises
The
Power Plus Box SE
system must be located next to a
Power Plus Box
system, as shown in the figure, and connected to
it hydraulically by means of the 5” flanged manifolds. Also the gas manifold, flue gas manifold and the condensate outlet
must be connected together. Finally the two modules must be connected together electrically.
To make these connections, refer to the instructions provided in the
Power Plus Box
system manual, in the chapter relative
to the series installation of the modules, keeping the following in mind:
- the hydraulic and gas connections must be made on the right side of the control unit (when standing in front of the
two systems)
- prepare the flue gas outlet and condensate outlet on the left side
- the electric cable inlet can be made on either side
- the flanged connections located on the left side of the
Power Plus Box
system cannot be used and therefore should
be closed with the set of blind flanges.
In any case, provide spaces to the sides of the machine that are sufficient for the dimensions of the external circuit com-
ponents and their assembly.
≥ 1 m
≥ 1 m
≥ 1 m
≥ 1 m
1250
1250
1530
650
POWER PLUS BOX
POWER PLUS BOX SE
Содержание 20072002
Страница 1: ...Installation Manual CONDENSING THERMAL MODULES Power Plus Box Installation Manual EN...
Страница 20: ...20...
Страница 21: ...21...
Страница 22: ...22...
Страница 23: ...23...