Beretta 20072002 Скачать руководство пользователя страница 10

 

10

1 9  Water circuit

28

30

29

31

27

G

G

SC

SF

AA

AA

2

19

18

17

15

20

21

22

23

16

10

10

12

12

1

2

3

4

5

7

9

13

11

1

2

3

4

5

7

8

9

10

13

24

25

26

11

6

6

8

10

14

Fan

Automatic bleed valve

Burner

Heat exchanger

Differential water and minimum pressure switch

Non-return valve

Pump

3-way cock

Delivery shut-off cock

10 

Drain

11 

Flue gas exhaust union with check valve and flue gas 

analysis outlet

12 

Gas valve

13 

Gas cock

14 

Safety cock (5.4 bar)

15 

Water flow manifold

16 

Water return manifold

17 

Hydraulic separator

18 

Drain cock

19 

Shut-off cock

20 

High temperature flow fitting

21 

Low temperature flow fitting

22 

Low temperature return fitting

23 

High temperature return fitting

24 

Fuel shut-off cock

25 

Maximum pressure switch

26 

Fuel shut-off cock probe

27 

Heating delivery probe

28 

Heating element delivery probe

29 

Safety thermostat (triggering at 90°C)

30 

Flue gas probe (triggering at 80°C)

31 

Heating return probe

AA

 Air inlet

SF

  Exhaust flue duct

SC

 Condensate outlet

G

  Gas supply

Содержание 20072002

Страница 1: ...Installation Manual CONDENSING THERMAL MODULES Power Plus Box Installation Manual EN...

Страница 2: ...ta CONFORMITY The Power Plus Box SE modular condensing systems com ply with Directive 2009 142 EC Gas Appliances Directive 92 42 EEC on efficiency requirements and Annex E and Pres Republic Decree n 4...

Страница 3: ...FORMATION 4 1 1 General Safety Information 4 1 2 Precautions 4 1 3 Description of the appliance 5 1 4 Safety devices 5 1 5 Identification 6 1 6 System layout 6 1 7 Coupling configuration 8 1 8 Technic...

Страница 4: ...n densing system at least once a year b This manual is an integral part of the equipment and therefore must be stored carefully and must ALWAYS accompany the modular condensing system even if it is so...

Страница 5: ...er pressure switch and an electronic safety system that controls a delivery sensor and a return sensor The equipment is protected if there is no water or in the case of insufficient circulation Safety...

Страница 6: ...akes any installation and maintenance operation difficult and invalidates the warranty 1 6 System layout 1 Control panel 2 Single heating element 3 Instrument panel 4 Pressure gauge 5 Fuel shut off co...

Страница 7: ...SET On Error RESET On Error 5 5 bar 1 3 2 4 5 6 7 30 8 9 10 31 11 14 15 16 17 19 20 21 10 13 22 43 45 41 46 10 13 47 48 23 24 25 26 27 28 29 18 13 12 32 33 36 37 38 34 35 39 40 42 44 50 51 52 53 54 55...

Страница 8: ...PLUS BOX SE SZ2 VM SB PZ1 PB SE PZ2 SZ1 SZ1 Delivery manifold sensor SZ2 Low system temperature sensor SB Boiler sensor SE Outdoor sensor PZ1 Zone 1 circulator high temperature PZ2 Zone 2 circulator l...

Страница 9: ...loss Tm 70 C 0 5 Flue gas temperature Return temperature 2 5 C max 80 C C CO2 at minimum 9 0 G20 10 4 G30 31 CO2 at maximum 9 0 G20 10 4 G30 31 CO S A at minimum maximum less than 11 91 mg kWh Weight...

Страница 10: ...is outlet 12 Gas valve 13 Gas cock 14 Safety cock 5 4 bar 15 Water flow manifold 16 Water return manifold 17 Hydraulic separator 18 Drain cock 19 Shut off cock 20 High temperature flow fitting 21 Low...

Страница 11: ...70 95 1108 18 61568 1 26135 20 12090 39 6033 58 3216 77 1817 96 1079 17 58719 2 25044 21 11634 40 5828 59 3116 78 1766 97 1051 16 56016 3 24004 22 11199 41 5630 60 3021 79 1717 98 1024 15 53452 4 2301...

Страница 12: ...tr remoto 24V contr remoto Comune Analogic Input Comune T A circ 1 Comune T A circ 2 2 Comune 4 J1 PC BARCODE NTC climatica J11 11 Comune NTC mand circ 2 NTC mand circ 1 Comune Comune NTC bollitore Co...

Страница 13: ...ne Sens Hall Termostato limite Valvola gas 2 1 3 a 9 m J16 NTC fumi J9 J4 a 10 WD J5 T3 PC Main IG SLAVE 2 3 C TS VG SR SF EA ER J10 J17 a m 13 Pressostato Diff PD Circolatore C Circolatore Bus line w...

Страница 14: ...ranty certificate Barcode labels 6 Accessory envelope containing Natural gas to LPG transformation kit valid for Eu rope Door key The following is also supplied positioned on the base inside the modul...

Страница 15: ...N Power Plus Box 100 SE System side connections MI1 High temperature flow manifold 3 MI2 Low temperature flow manifold 3 RI1 High temperature return manifold 3 RI2 Low temperature return manifold 3 IG...

Страница 16: ...ries installation of the modules keeping the following in mind the hydraulic and gas connections must be made on the right side of the control unit when standing in front of the two systems prepare th...

Страница 17: ...16 17 16 POWER PLUS BOX POWER PLUS BOX SE 1 Flue gas exhaust manifold connection 2 Drain 3 Power Plus Box modular system 4 Power Plus Box SE modular system 5 Manifold delivery sensor trap 6 Gas shut o...

Страница 18: ...to add water to central heating systems Use a manual device in stead and record top ups in the system service book b If there are more than one boiler they must all be put into service either contemp...

Страница 19: ...is therefore important to avoid two factors possibly leading to the above mentioned pro cesses i e contact between air and water in the installation and regular topping up with fresh water To elimina...

Страница 20: ...20...

Страница 21: ...21...

Страница 22: ...22...

Страница 23: ...23...

Страница 24: ...oilers com Beretta reserves the right to modify the characteristics and specifications given in this publication at any time and without prior notice as part of its policy of continuous product improv...

Отзывы: