Assembly & initial set-up
4
Assembly & initial set-up
General assembly instructions
•
Unless otherwise specified, torque all bolts to
“torque specification table” (see table of content for
page number)
•
Refer to parts breakdown section for part
identification.
Accessory assembly
Installation of rotation rings:
A.
Wrap the rotation ring (item 1) (groove inside) around
the edge of the discharge chute (item 2) as shown.
B.
Place the chute (item 3) (opening facing forward) over
the rotation ring.
IMPORTANT
: The ring must be inside the base of the
chute. It is the chute that will hold the rotation ring in
place.
C.
On the right side of snowblower, install the grooved
rotation ring (item 4) under the chute as shown.
Secure the chute and rotation ring in place with six
hex bolts 1/4’’ x 1 1/4’’ (item 5) and nu
ts as shown.
Do not tighten too firmly.
D.
On the left side of the snowblower, install the other
half of rotation ring (item 6) under the chute as
shown.
Secure the chute and rotation ring in place with three
hex bolts 1/4’’ x 1 1/4’’ (item 7) and nuts (as sh
own).
Do not tighten the nuts too firmly.
NOTE
: Nuts that are too tight might prevent the chute
from rotating side to side. Only a slight pressure is
necessary.
Installation of the motor support
A.
Screw the hydraulic hoses (item 1 and 2) to the
motor (item 3), tighten to 22-24 ft-lb. Then put
on the nylon sleeving (item 4) over the two
hoses.
B.
Remove the guard (item 5) from the motor
support.
Содержание BERCO 701011-1
Страница 11: ...Parts breakdown 9 Part list and parts breakdown Principal accessory ...
Страница 12: ...Parts breakdown 10 ...
Страница 13: ...Parts breakdown 11 ...
Страница 14: ...Parts breakdown 12 ...