16
Bentone
165 205 19-2
4. Installation
4.1
General instructions
Oil burners must be installed in accordance with local regulations. The installer
must therefore be knowledgeable of the regulations pertaining to oil and
combustion.
Only oil suitable for the burner must be used and then in combination with a
suitable oil filter installed before the burner’s oil pump.
If the burner is replacing an existing burner, ensure that the oil filter is
replaced or cleaned. Installation may only be performed by qualified
personnel.
Care should be taken by the installer to ensure that electrical cables and oil
lines are not pinched or otherwise damaged during installation or servicing.
4.2
Inspection and maintenance
The system must be maintained at the interval specified in the service
schedule. If the burner is in a dirty environment, service should be done at
more frequent intervals.
4.3
Start-up
In order to obtain the correct setting, a flue gas analysis and temperature
measurement must be carried out. Otherwise, there is a risk of soot build up,
poor efficiency or condensation in the chimney. The system must be fine-tuned
at start-up. The temperature in the chimney at a depth of 0.5 m must be at
least 60 °C to prevent condensation.
4.4
Delivery inspection
Make sure everything is delivered and the goods have not been damaged
during transit. If something is wrong with a delivery, report it to the supplier.
Transport damage must be reported to the shipping company.
4.5
Preparing for installation
Check that the burner’s dimensions and capacity range are suitable for the
relevant boiler. The power data on the rating plate refers to the burner’s
minimum and maximum power.
Содержание B 40 A
Страница 18: ...18 Bentone 165 105 03 2 4 8 Handling and lifting instruction The lifting aid are available as spare parts...
Страница 41: ......
Страница 42: ......
Страница 43: ......
Страница 44: ...Enertech AB P O Box 309 SE 341 26 Ljungby www bentone com...