BENSON OIL UNIT HEATER
30
S E C T I O N C
B A S I C U S E R
I N S T R U C T I O N S
10.0 Introduction
The following information is relevant to the
Oil fired Unit Heater range manufactured by
Benson Heating. These heaters are
manufactured within a strictly controlled
quality system to ISO 9001: 2000.
All Benson Heating Oil Fired Heaters are CE
marked, having been found to satisfy the
essential requirements of the following
European Directives.
Machinery Directive (89/392/EEC)
Low Voltage Directive (73/23/EEC & 93/68/
EEC)
Electromagnetic Compatibility Directive
(89/336/EEC & 91/31/EEC)
Product Liability Directive (65/374/EEC)
Benson Heating support all new products
being supplied to their customers with a
comprehensive information pack, and it is the
responsibility of the owner, user, or hirer, of
such products supplied by
Benson Heating to ensure that operators are
provided with the operator manual, and that
they are suitably instructed
regarding the purpose of the manual and
safety instructions. In addition to this,
operators must also be suitably and
adequately trained in the use of the
product.
Contained within the text of this manual, the
words
'Caution'
and
'Warning'
are used to
highlight certain points.
Caution
is used when failure to follow or
implement the instruction (s) can lead to a
premature failure or damage being
occasioned to the heater or its component
parts.
Warning
is used when failure to heed or
implement the instruction(s) can lead not
only to component damage, but can also
lead to a hazardous situation being created
where there is a risk of personal injury or
death
10.1 Commissioning and hand over
Warning
As part of the commissioning programme,
the commissioning engineer must go through
the following with the operator.
(i) Lighting, shutdown, and operational
information.
(ii) Safety features, data plate, and labelling.
(iii) The requirement for regular inspection -
especially if the heater is within a more
demanding environment - and the need for
regular servicing, carried out by competent
and qualified engineers.
Caution
After approximately 100 hours of running, the
fan must be checked to ensure that it is
correctly working,
It is strongly advised that this is undertaken
by the commissioning engineer, and not the
operator.
10.2 Servicing
Warning
Servicing must be carried out on a regular
basis, the maximum interval between
services being one year.
It is a requirement that only suitably qualified
and competent persons are allowed to
undertake the servicing.
10.3 Start up procedure
CP2 controller
(a) Ensure that the oil supply valves are
open, and that the mains electrical supply is
turned on
(b) Set time clock to an 'on' period
(c) Set room thermostat to demand heat
(d) Set heat/ventilation switch to 'heat'
Содержание OUHA 100
Страница 19: ...BENSON OIL UNIT HEATER 19 9 0 Wiring Diagram OUHA 100 OUHA 140 ON OFF 33 65 100...
Страница 20: ...BENSON OIL UNIT HEATER 20 Wiring Diagram OUHA 200 OUHA 350 ON OFF 33 65 106...
Страница 21: ...BENSON OIL UNIT HEATER 21 Wiring Diagram OUHA 100 OUHA 140 HIGH LOW 33 65 107...
Страница 22: ...BENSON OIL UNIT HEATER 22 Wiring Diagram OUHA 200 OUHA 350 HIGH LOW 33 65 108...
Страница 23: ...BENSON OIL UNIT HEATER 23 Wiring Diagram OUHC 200 OUHC 350 ON OFF 33 65 191...
Страница 28: ...BENSON OIL UNIT HEATER 28 12 0 Heater Dimensions Axial Fan...
Страница 29: ...BENSON OIL UNIT HEATER 29 12 1 Heater Dimensions Centrifugal Fan...