Document Index.
1 Installation requirements.
1.1 Compliance notices.
1
.2 Certifi cates of conformity.
1.3 General product information.
1.4 General requirements.
1.5 Delivery and pre-installation checks.
1.6 Warranty.
1.7 Health and Safety.
1.8 Location / Positioning.
1.9 Fuel supply.
1.9.1 Fuel.
1.9.2 Storage tanks.
1.9.3 Single pipe system (gravity fed).
1.9.4 Two pipe system.
1.9.5 Pressurised ring main system.
1.9.6 Pipework and fi ttings.
1.10 Electrical supply - general.
1.11 Air supply
1.11.1 Heaters installed within the heated space.
1.11.1.1 Natural ventilation openings to the
heated space
1.11.1.2 Mecanical ventilation openings to the
heated space
1.11.2. Heaters Installed within a plant room or
enclosure.
1.11.2.1 Natural ventilation openings to plant
rooms
1.11.2.2 Natural ventilation openings to
enclosures
1.11.2.3 Mech ventilation to a plant room or
enclosure.
1.12 Air distribution system.
1.13 Flue system.
1.14 Dimensions.
1.15 Technical details.
1.15.1 Reference information
2 Installation Instructions
2.1 Packaging/siting
2.2 Heater mounting
2.3 Minimum clearances
2.4 Warm air circulation
2.5 Flue installation
2.6 Oil installation/connection
2.7 Electrical installation/connection
2.8 Heater control installation
Wiring diagrams
3 Commissioning instructions
3.1 Commissioning - pretest
3.2 Commissioning - ignition
3.3 Commissioning - air delivery system.
3.4 Commissioning - hand over
4 Servicing instructions
4.1 Planned servicing.
4.2 Servicing procedure - Major component parts
4.2.1 Flue
4.2.2 Axial fan
4.2.3 Heat exchanger
4.2.4 Electrical supply
4.2.5 Oil supply
4.2.6 Burner
4.2.7 Air delivery system
4.2.8 Report
4.3 Service re-commissioning
5 Spare Parts
6 Fault Finding Guide
7 Replacing Parts
7.1 Burner
7.2 Controller
7.3 Electrode assembly
7.4 Nozzle
7.5 Photocell
7.6 Oil pump
7.7 Contactor
7.8 MCB
7.9 Fan/Limit stat assembly
7.10 Axial fan
8 User and Operating Instructions
8.1 Commissioning and hand over
8.2 Servicing
8.3 Start up procedure
8.4 Stop procedure
8.5 Shut down procedure
8.6 Ventilation only
8.7 Lockout situations
Содержание OUH 2 100
Страница 20: ...Wiring Diagram 33 65 245 Models OUHA OUHC40 ON OFF Riello Oil Fried Burner...
Страница 21: ...Wiring Diagram 33 65 246 Models OUHA 60 70 ON OFF Riello Oil Fried Burner...
Страница 22: ...Wiring Diagram 73 65 010 Models OUHA 90 100 ON OFF Riello Oil Fried Burner...
Страница 23: ...Wiring Diagram 33 65 247 Models OUHC 60 100 ON OFF Riello Oil Fried Burner...
Страница 24: ...Wiring Diagram 33 65 248 Models OUHA OUHC 40 HI LOW Riello Oil Fried Burner...
Страница 25: ...Wiring Diagram 33 65 249 Models OUHA 60 70 HI LOW Riello Oil Fried Burner...
Страница 26: ...Wiring Diagram 73 65 011 Models OUHA 90 100 HI LOW Riello Oil Fried Burner...
Страница 27: ...Wiring Diagram 33 65 250 Models OUHC 60 100 HI LOW Riello Oil Fried Burner...
Страница 28: ...Remote Connections 33 65 132 ON OFF HI LOW Less Controls Remote Connections 33 65 228 ON OFF to SmartCom SC3 SZ...
Страница 29: ...Remote Connections 33 65 229 HI LOW to SmartCom SC3 MZ Remote Connections 33 65 131 ON OFF HI LOW to CP4...
Страница 35: ...Turbulator positions in models 40 70 8 off Turbulator positions in models 90 100 12 off...
Страница 43: ...Notes...