STEP 7
(
Mounting the Top Trough Assembly. )
1. Remove all of the Equalizer pulleys in preparation of
installing the Top Trough assy.
2. Using a lifting device, raise the Top Trough Assembly
into position on top of the columns. Bolt to the Columns
using the 10 mm Hex Bolts, Nuts and Washers.
3.
YOU MUST
POSITION THE SWITCH ENCLOSURE
ADJACENT POWERSIDE COLUMN. (See Fig. 7.1)
14
WARNING !
If the anchor bolts were loosened to aid on the
installation of the top trough, tighten anchor bolts
as indicated in Step 5 items 4-6.
Fig 7.1
NOTE:
To ease installation of the Top Trough, it helps to keep
the anchor bolts loose on one of the Columns until the
Top Tough is mounted.
NOTE:
In order to route the equalizer cables
the pulleys must be removed
THIS
SPACE
INTENTIONALLY
LEFT
BLANK
Содержание XPR-7TR
Страница 11: ...11 FLOORPLAN CAPACITY MODEL XPR 7TR Dim A 3683mm 145 CAPACITY 7 000 Lbs ...
Страница 12: ...12 MAIN ASSEMBLY VIEW ...
Страница 24: ...24 ...
Страница 28: ......
Страница 31: ...31 OPTIONAL EQUIPMENT INSTALLATION ...
Страница 35: ...35 ...
Страница 36: ...36 ...
Страница 47: ...47 ...