background image

STEP 17

( Leveling / Synchronizing  )

1.    Using an engineer’s automatic Level (transit), locate 

the Level at a convenient location in the shop that allows 

an unobstructed view of all four corners of the runways.

2.    Follow the Level manufacturer’s instructions for  

proper setup of the Level. Be sure it is adjusted level in 

all directions.

3.  Raise the lift approximately 30”- 40”. Then lower the 

lift until all primary safeties are engaged in each column 

and the runways are completely resting on the primary 

safeties. 

4.  Place a Level target on the right/front corner of the 

runway. (See Fig. 17.1)

5.   Beginning with “A” position, sight the level to the 

target and mark the number or the graduation on the inch 

scale of the target that aligns to the cross hairs of the 

Level. (See Fig. 17.1)

Note:

Use a pencil, marking pen or attach a paper clip

onto the target scale at the cross hair reference.

6.   Next, move the target and place it at point “B” on the 

runway. (See Fig. 17.1)

7.   Rotate the Level and focus on the target scale.

8.   Adjust the adjustment nut on the safety ladder bar at 

the top of the Column at “B” until the cross hairs of the 

Level align to reference mark on the target scale. (See 

Fig. 17.1)

9.   Repeat steps locating the target assembly at points 

“C” and “D” and adjusting Safety Ladders at each cor-

responding Column until the reference mark on the target 

scale is on the cross hairs of the Level. The Runways are 

now level at all four points. (See Fig. 17.1)

10.  To complete the leveling procedures, lock each Safety

Ladder Jam nut tightly against bottom of Column Top 

Plate. (See Fig. 17.2)

11.  Next, load vehicle onto the lift.

12.  Raise the lift to full height. Listen and watch as the 

primary safeties engage the safety ladder. Synchronize by 

adjusting the cables so that all four latches click at same 

time. Make necessary adjustments to the cables allowing 

compensation for stretch.

Safety locks may not engage at exactly the same time 

when vehicles are being raised. They should be close.

Be sure that all four corners have passed the SAME

Safety Ladder Bar slot before lowering lift on the safety 

locks. NEVER lower lift on different Safety Lock position 

or damage to the lift may result.

13. Install the four Cross tube Covers. (See Fig. 17.3)

STEP 18

( Bleeding )

1.   Lift must be fully lowered before changing or adding 

fluid.

2.   Raise and lower lift six times. The Cylinder is self-

bleeding. After bleeding system, fluid level in Power Unit 

reservoir may be down. Add more fluid if necessary to 

raise lift to full height. It is only necessary to add fluid to 

Raise lift to full height.

3.   To pressure test, run lift to full rise and run motor for 

approximately 3 seconds after lift stops. This will put pres-

sure on the hydraulic system. Stop and check all fittings 

and hose connections. Tighten or reseal if required.

30

Fig 17.1 

Fig 17.2 

Fig 17.3 

Hex Head 

Bolt

Crosstube 

Cover

Hex Nut

Содержание HD-7ZM

Страница 1: ... shipping carrier as receipt of this product as listed in your invoice as being in a good condition of shipment If any of these goods listed on this Bill of Lading are missing or damaged do not accept goods until the shipping carrier makes a notation on the freight bill of the missing or dam aged goods Do this for your own protection BE SAFE Your new lift was designed and built with safety in mind...

Страница 2: ...an a commitment to you It is also a commitment to the value of your new BendPak lift For full warranty details and to register your new lift contact your nearest BendPak dealer or visit http www bendpak com support warranty NOTE Every effort has been taken to ensure complete and accurate instructions have been included in this manual however possible product updates revisions and or changes may ha...

Страница 3: ...ct initial function t Read and follow the safety instructions Keep them readily available for machine operators t Make certain all operators are properly trained know how to safely and correctly operate the unit and are properly supervised t Allow unit operation only with all parts in place and operating safely t Carefully inspect the unit on a regular basis and perform all maintenance as required...

Страница 4: ...Runway Installation 15 Step 6 Offside Runway Installation 15 Cable Routing Information 16 17 Step 7 Sheave Installation 18 Step 8 Cable Installation 18 19 Step 9 Power Unit Installation 19 20 Step 10 Routing Hydraulic Hoses 21 22 Step 11 Routing Air Lines 23 Safety Air Line Routing 24 Step 12 Power Unit Hook Up 25 27 Step 13 Inspecting Slack Safety Springs 27 Step 14 Lift Start Up Final Adjustment...

Страница 5: ...o operator or bystander or damage to property or lift Failure to follow danger warning and caution instructions may lead to serious personal injury or death to operator or bystander or damage to property Please read entire manual prior to installation Do not operate this machine until you read and understand all the dangers warnings and cautions in this manual For additional copies or further info...

Страница 6: ...f vehicle is in danger of falling 10 ALWAYS ENSURE that the safeties are engaged before any attempt is made to work on or near vehicle 11 DRESS PROPERLY Non skid steel toe footwear is recommended when operating lift 12 GUARD AGAINST ELECTRIC SHOCK This lift must be grounded while in use to protect the operator from electric shock Never connect the green power cord wire to a live terminal This is f...

Страница 7: ...alt surface or any surface other than concrete t DO NOT install or use this lift on expansion seams or on cracked or defective concrete t DO NOT install or use this lift on a second elevated floor without first consulting building architect CONCRETE SPECIFICATIONS LIFT MODEL CONCRETE REQUIREMENTS HD 7MZ 5 Min Thickness 2 500 PSI All models MUST be installed on 2500 PSI concrete only conforming to ...

Страница 8: ...rosstube Offside Runway Stiffener Bar Tire Stops Power Unit Column Stabilizing Cables WARNING When removing the lift from shipping angles pay close attention as the posts can slide and can cause injury Prior to removing the bolts make sure the posts are held securely by a fork lift or some other heavy lifting device ...

Страница 9: ...ETTING 75 1 2 1927 mm L Outside Edge of Runways WIDE SETTING 82 2085 mm M Drive Thru Clearance 86 1 2 2201 mm N Length of Runways 188 4 788 mm Min Wheelbase Rated Capacity 135 3429 mm Min Wheelbase 75 Capacity 115 2921 mm Min Wheelbase 50 Capacity 95 2413 mm Min Wheelbase 25 Capacity 80 2032 mm Locking Positions 30 Lock Spacing Every 4 101 mm Lifting Time 80 Seconds Standard Motor 220 VAC 60Hz 1 P...

Страница 10: ...to elevation of floor A Mark locations where lift columns will be posi tioned in bay B Place target on floor at column positions NOT on column base plates and record readings C Find the highest of the four locations Find the difference between the readings at each of the re maining three columns and the highest reading D The difference is the estimated amount of shim thickness needed at each colum...

Страница 11: ...unway MUST be installed to the inside For the remainder of this instruction we will illustrate the Power Unit mounted at the PASSENGER SIDE RIGHT REAR Column TOP ILLUSTRATION For Power Unit at Left front rotate lift 180 leaving Approach Ramps and Front Tire Stops in original position IMPORTANT NOTE POWER UNIT LOCATION Powerside Runway Powerside Runway Power Unit Power Unit X X Approach Ramps Appro...

Страница 12: ...ness recommended by the factory is no more than 1 2 per Column using shims and anchors provided with the lift A maximum shim thickness of 2 is possible by ordering optional shim plates Contact your authorized BendPak Distributor for ordering informa tion 3 Lay the columns down and slide the Cross Tubes into the Columns making sure the Plastic Slide Blocks are still in position NOTE The Sheave Wind...

Страница 13: ...cable hole INWARD See Fig 3 6 3 7 6 Tilt up the Column and Cross Tube assemblies lining the base plates up with the chalk lines made earlier DO NOT BOLT DOWN THE COLUMNS AT THIS TIME See Fig 3 8 7 For HD 7MZ models Bolt both Stiffener Tubes to the Top Caps with the Hex Head Bolts and Nuts See Fig 3 8 and 3 9 8 The Columns and Cross Tubes will now be in position and spaced properly for the Runways ...

Страница 14: ...n the Safety Ladder To prevent this manually hold the Slack Safety in the disengaged position while lowering the Cross Tube ends See Fig 4 1 4 3 3 The Columns and Cross Tubes will now be in position and spaced properly for the Runways Be very careful not to disturb the Columns and Cross Tubes at this time as they may tip over causing personal injury or harm See Fig 4 4 Be careful not to disturb th...

Страница 15: ...les located at the side of the Powerside Runway should be adjacent to the Power Unit Column Align the holes in the Runway with the holes on the Cross Tubes and bolt together using four M12 x 1 75 x 90 Hex Head Bolts and Washers See Fig 5 4 STEP 6 Offside Runway Installation 1 Position the Offside Runway on top of the Cross Tubes with the Utility Rail located inside Determine the desired location o...

Страница 16: ...16 Cable Routing Diagrams Please review the following diagrams and Cable List Install Lifting Cables C and D in the upper grooves of the Sheaves first ...

Страница 17: ... HD 7PXW 5595055 Cable Assembly 10mm x 12 072 mm D Lifting Cable 1 HD 7PXW 5595032 Cable Assembly 6mm x 5 770mm DT Stiffening Cable 4 Cable Routing Diagrams Please review the following diagrams and Cable List Install Lifting Cables C and D in the upper grooves of the Sheaves first Cable Identification List Please review the following Cable List Identify each Cable prior to installation Note Cable ...

Страница 18: ...ute the threaded Cable ends through the ends of each Cross Tube Care must be taken when routing the Lifting Cables to ensure they are routed below the Cross Tube Mounting Bolts See Fig 8 2 3 Route Cables over the Slack Safety Sheaves then to the top of each Column Secure using the M18 Hex Head Nuts and Flat Washers See Fig 8 3 Failure to route Lifting Cables as described may lead to serious person...

Страница 19: ... Nuts Then fill the reservoir with 12 quarts of 10 WT hydraulic oil or Dexron III automatic transmission fluid See Fig 9 1 DO NOT PERFORM ANY MAINTENANCE OR INSTALLATION OF ANY COMPONENTS WITHOUT FIRST ENSURING THAT ELECTRICAL POWER HAS BEEN DISCONNECTED AT THE SOURCE OR PANEL AND CANNOT BE RE ENERGIZED UNTIL ALL MAINTENANCE AND OR INSTALLATION PROCEDURES ARE COMPLETED ALL WIRING MUST BE PERFORMED...

Страница 20: ...ibration Dampener Flex Tube Flex Tube Bracket 90 Air Line Compression Fitting 90 Hydraulic Fitting w O ring Power Unit Plastic Nut Return Port Return Air Line Power Hydraulic Hose Assembly Straight Fitting end Power Port AIR TUBING ASSEMBLY SEE PAGE 22 FOR ASSEMBLY OF AIR LINE TUBING INTO FITTING ...

Страница 21: ...determine proper connection ports for Power and Return lines It will be necessary to remove shipping plugs from both ports prior to installing Fittings Fig 10 2 Install Fittings 90 Air Line Compression Fitting 90 O Ring Fitting Fig 10 1 Remove Shipping Plugs Power Port Return Port NOTE For HD 7MZ models refer to Page 23 Fig 9 2 for Power Unit Flex Hose Configuration referred to in Steps 9 10 Fig 1...

Страница 22: ...0 Fitting on the Hydraulic Hose in the Flex Hose Bracket Assembly Tighten the plastic nuts securely See Fig 10 7 7 Connect the hydraulic hose and air line as shown below making sure the hydraulic hose passes through the retaining rings MAKE SURE HOSES ARE KEPT CLEAR OF CABLES There will be one air line hose left uncon nected in this step This air line will be used to activate the pneumatic safety ...

Страница 23: ...line has been connected with the Push Button Air Valve cut the air lines to length by following the Safety Air Line Routing diagram located on Page 25 and connect female branch tee fittings where needed Fig 11 1 Air Supply In Fig 11 2 NOTE A FILTER REGULATOR LUBRICATOR MUST BE INSTALLED ON AIR SUPPLY AT LIFT FAILURE TO DO SO WILL VOID THE WARRANTY NOTE MAKE SURE THE PUSH BUTTON AIR VALVE PORT MARK...

Страница 24: ...GH THE RETAINER TUBING ON THE OUTSIDE OF THE CROSSTUBES To Air Cylinder To Air Cylinder To Air Cylinder To Air Cylinder NOTE FEED AIR LINE TUBING THROUGH THE RETAINER TUBING ON THE INSIDE OF THE POWER SIDE RAMP Retainer Tubing Retainer Tubing Tee Fitting Tee Fitting Tee Fitting PAY CAREFUL ATTENTION TO KEEP AIR LINE CLEAR OF ANY PINCH POINTS IMPROPER ASSEMBLY MAY RESULT IN SAFETY LOCK FAILURE AN M...

Страница 25: ... letter E or F then use the E or F wiring diagrams IMPORTANT POWER UNIT INSTALLATION NOTES n DO NOT run power unit with no oil Damage to pump can occur n The power unit must be kept dry Damage to power unit caused by water or other liquids such as detergents acid etc is not covered under warranty n Improper electrical hook up can damage motor and will not be covered under warranty n Motor can not ...

Страница 26: ...26 ...

Страница 27: ...arts of 10 WT hydraulic oil or Dexron III automatic transmission fluid 2 Spray the inside of the Columns where the Slide Blocks glide with a light lubricant or WD 40 3 Test the Power Unit by pressing the push button switch If the motor sounds like it is operating properly raise the lift and check all Hose connections for leaks If the motor gets hot or sounds peculiar stop and check all electrical ...

Страница 28: ...g uniformly and that the safety release mechanisms are functioning Re adjust if neces sary STEP 15 Anchoring The Columns Proceed to Step 16 if Not Anchoring to Floor HP 7MZ must be anchored 1 Before proceeding double check the measurements and make certain that the bases of each Column are square and aligned with the chalk line Raise the lift up and down and make sure it operates properly at the l...

Страница 29: ...d tighten each nut 3 5 turns past hand tight IMPORTANT If anchor bolts do not hold when tightened to indicated amount concrete must replaced Saw cut and remove 24 x 24 square area each column base then re pour with rein forced 2500 PSI concrete to a depth of six inches mini mum keying new concrete under existing floor See Fig 15 5 STEP 16 Attaching the Approach Ramp Tire Stops 1 Install the Front ...

Страница 30: ...n the target scale is on the cross hairs of the Level The Runways are now level at all four points See Fig 17 1 10 To complete the leveling procedures lock each Safety Ladder Jam nut tightly against bottom of Column Top Plate See Fig 17 2 11 Next load vehicle onto the lift 12 Raise the lift to full height Listen and watch as the primary safeties engage the safety ladder Synchronize by adjusting th...

Страница 31: ... procedures to periodically maintain the lift in accordance with the lift manufacturer s instructions or ANSI ALI ALOIM 2000 American National Standard for Automotive Lifts Safety Requirements for Operation Inspection and Maintenance and The Employer shall ensure that lift maintenance personnel are qualified and that they are adequately trained in the maintenance of the lift Shall maintain the per...

Страница 32: ...hicle while on lift ALWAYS CLEAR AREA if vehicle is in danger of falling ALWAYS REMOVE tool trays stands etc before lower ing lift ALWAYS RELEASE safety locks before attempting to lower lift DO NOT position yourself between a wall and the lift If the vehicle falls in that direction you may be severely injured or killed To Raise Lift 1 Position vehicle tires in the center of each Runway 2 Set parki...

Страница 33: ...y are in good operating condition Lubricate locking latch shafts Push release arm several times for oil to penetrate pivot points 2 Check equalizer cable tension Adjust per lift installa tion instructions 3 Check all Cables for excessive signs of wear 4 Make a visual inspection of ALL MOVING PARTS and check for excessive signs of wear Always call local service representative if electrical problems...

Страница 34: ... heavy lubricant applied by any method including pump spray dispensing brush hand and or swabbing HOW OFTEN TO INSPECT t Lifting cables should be visually inspected at least once each day when in use as suggested by American Petroleum Institute API RP54 guidelines t Any lifting cables that have met the criteria for removal must be immediately replaced WHEN TO REPLACE LIFTING CABLES DUE TO BROKEN W...

Страница 35: ...35 ...

Страница 36: ...36 ...

Страница 37: ...t The vehicle manufacturer s recommendations should be used for spotting and lifting the vehicle LIFT OPERATION SAFETY t It is important that you know the load limit Be careful that you do not overload the lift If you are unsure what the load limit is check the data plate found on one of the lift columns or contact the manufacturer t The center of gravity should be followed closely to what the man...

Страница 38: ...ures before operating lift t KEEP HANDS AND FEET CLEAR Remove hands and feet from any moving parts Keep feet clear of lift when lowering Avoid pinch points t ONLY TRAINED OPERATORS should operate this lift All non trained personnel should be kept away from work area Never let non trained personnel come in contact with or operate lift t USE LIFT CORRECTLY Use lift in the proper manner Never use lif...

Страница 39: ...d start unit allowing possible contamination it to run for 15 seconds 4 Dirty oil Replace oil with clean Dexron ATF 5 Tighten all fasteners Tighten fasteners to recommended torques 6 Check for free movement of release If handle does not move freely replace bracket or handle assembly 7 Check motor is wired correctly Compare wiring of motor to electrical diagram on drawing 8 Oil seal damaged or cock...

Страница 40: ...ew part Replace with new part 5 Reset circuit breaker fuse Reset circuit breaker fuse 6 Return unit for repair Return unit for repair 7 See Installation Manual See Installation Manual 8 Check wall outlet voltage and wiring Make sure unit and wall outlet is wired properly Motor must run at 208 230 VAC LIFT LOWERS SLOWLY OR NOT AT ALL POSSIBLE CAUSE 1 Cylinders binding 1 2 Release valve clogged 5 4 ...

Страница 41: ...e weight of vehicle to weight limit of the lift 7 Flush release valve Hold release handle down and start unit allowing it to run for 15 seconds 8 Replace with new part Replace with new part 9 Return unit for repair Return unit for repair 10 Check motor is wired correctly Compare wiring of motor to electrical diagram on power unit drawing 11 Inlet screen clogged Clean inlet screen or replace 12 Che...

Страница 42: ...ace oil seal around pump shaft 3 Bleed cylinder Refer to Installation Manual 4 Flush release valve Hold release handle down and start unit allowing it to run for 15 seconds 5 Replace with new valve Replace with new valve 6 Return unit for repair Return unit for repair 7 See Installation Manual Consult Lift Manufacturer 8 Check complete hydraulic system for leaks Tighten all hydraulics fittings and...

Страница 43: ...0 M6 x 1 0 6 10 14 13 5 16 18 M8 x 1 25 12 19 29 31 4 3 8 16 M10 x 1 50 20 33 47 62 7 16 14 32 54 78 1 2 13 M12 x 1 75 47 78 119 108 9 16 12 M14 x 2 00 69 114 169 173 5 8 11 M16 x 2 00 96 154 230 269 3 4 10 M18 x 2 50 155 257 380 372 7 8 9 M22 x 2 50 206 382 600 716 3 4 Anchor Bolts 75 MIN 110 MAX Torque Recommendations Grease Port Lubrication Locations Lubricate Once A Week ...

Страница 44: ...44 ...

Страница 45: ...45 ...

Страница 46: ...46 ...

Страница 47: ...47 ...

Страница 48: ...48 ...

Страница 49: ...49 ...

Страница 50: ...50 ...

Страница 51: ...51 ...

Страница 52: ...52 ...

Страница 53: ...53 MAINTENANCE RECORDS ...

Страница 54: ...54 MAINTENANCE RECORDS ...

Страница 55: ...55 NOTES ...

Страница 56: ...56 ...

Отзывы: