14
STEP 4
( Raising The Cross Tubes )
1. Before proceeding, it will be necessary to first raise
the Cross Tubes off the ground to facilitate Cable routing
and final assembly.
2. Manually raise the Cross Tubes until the Primary
Safety Locks engage and rest on the lock position second
down from the top of the Ladder or approximately 66” off
the ground. It is important that the SLACK SAFETY LOCK
IS CLEARED. The Slack Safety Lock must never rest
on the Safety Ladder. To prevent this, manually hold the
Slack Safety in the disengaged position while lowering the
Cross Tube ends. (See Fig. 4.1-4.3)
3. The Columns and Cross Tubes will now be in position
and spaced properly for the Runways. Be very careful not
to disturb the Columns and Cross Tubes at this time as
they may tip over causing personal injury or harm. (See
Fig. 4.4)
Be careful not to disturb the Columns and Cross Tubes
as they may tip over causing personal injury or harm
IMPORTANT NOTE
It is important that the SLACK SAFETY LOCK IS
CLEARED. The Slack Safety Lock must never rest on
the Safety Ladder.
Fig 4.2
Fig 4.1
Fig 4.4
Fig 4.3
Содержание HD-7ZM
Страница 26: ...26 ...
Страница 35: ...35 ...
Страница 36: ...36 ...
Страница 44: ...44 ...
Страница 45: ...45 ...
Страница 46: ...46 ...
Страница 47: ...47 ...
Страница 48: ...48 ...
Страница 49: ...49 ...
Страница 50: ...50 ...
Страница 51: ...51 ...
Страница 52: ...52 ...
Страница 53: ...53 MAINTENANCE RECORDS ...
Страница 54: ...54 MAINTENANCE RECORDS ...
Страница 55: ...55 NOTES ...
Страница 56: ...56 ...