22
4. Tighten each Nut until there is at least one inch of
threads protruding through the top of the nut. The Cables
will remain loose until start up and final Cable adjust
-
ments are made. (See Fig. 8.4)
5. After routing the Cables double-check to make sure
all are properly positioned and remain within the grooves
of ALL Sheaves. (See Fig. 8.5 - 8.6)
STEP 9
( Power Unit Installation )
1. Mount the Power Unit to the Mounting Bracket using
the M8 Hex Head Bolts and Nylock Nuts. Then fill the
reservoir with 12 quarts of 10-WT hydraulic oil or Dexron
III automatic transmission fluid. (See Fig. 9.1)
DANGER!
DO NOT PERFORM ANY MAINTENANCE OR
INSTALLATION OF ANY COMPONENTS WITH OUT
FIRST ENSURING THAT ELECTRICAL POWER HAS
BEEN DISCONNECTED AT THE SOURCE OR PANEL
AND CANNOT BE RE-ENERGIZED UNTIL ALL
MAINTENANCE AND/OR INSTALLATION
PROCEDURES ARE COMPLETED.
DANGER !
ALL WIRING MUST BE PERFORMED
BY A LICENSED ELECTRICIAN.
NOTE:
For HD-7PXW/PXN models refer to Page
23, Fig. 9.2 for Power Unit / Flex Hose
Configuration referred to in Steps 9 & 10.
Fig 8.4
Fig 8.5
Fig 8.6
Fig 8.3
Fig 9.1
M8 Hex
Bolts
Flex Tube
Bracket
Vibration
Dampener
M8 Nylock
Nuts
Flat
Washers
Содержание HD-7500BL
Страница 29: ...29 ...
Страница 38: ...38 ...
Страница 39: ...39 ...
Страница 48: ...48 ...
Страница 67: ...67 This page intentionally left blank ...