STEP 5
( Powerside Runway Installation )
1. Locate the Powerside Runway easily identified by the
Cylinder and Sheave roller mounting structures welded on
the underside. The Powerside Runway will be positioned
on the side of the lift where the power unit is installed.
(See Fig. 5.1)
2. Install Cylinder and Pull Box Assy. as shown. Make
sure the Pull Box Assy. with the window for the retaining
nut and Zerk fittings are facing down.
(See Fig. 5.2 - 5.3)
3. Remove any pre-installed Cable Sheaves from the
Powerside Runway making sure to pay attention to the
order in which they are removed. (This will help at the time
of re-installation.) (See Page 17.)
4. Position the Powerside Runway on top of the Cross
Tubes with the utility rail towards the center. The Flex
Tube Holes located at the side of the Powerside Runway
should be adjacent to the Power Unit Column. Align the
holes in the Runway with the holes on the Cross Tubes
and bolt together using four M12 x 1.75 x 90 Hex Head
Bolts and Washers. (See Fig. 5.4)
STEP 6
( Offside Runway Installation )
1. Position the Offside Runway on top of the Cross Tubes
with the Utility Rail located inside. Determine the desired
location of the Offside Runway. Align the holes in the
Runway with the desired holes on the Cross Tubes and
bolt together using four M12 x1.75 x 90 Hex Head Bolts
and Washers. Lubricate bolt with WD-40 or equivalent and
torque to 55 ft/lbs . (See Fig. 6.1)
DANGER!
DO NOT PROCEED with Cable installation or go near
the lift work area unless visual confirmation is made of
ALL Safety Locks. ALL locks MUST be engaged before
proceeding. Failure to comply with these instructions may
result in severe personal injury or death. (See page 13)
Fig 5.1
Fig 5.2
Fig 5.3
Fig 6.1
Fig 5.4
Содержание HD-7500BL
Страница 29: ...29 ...
Страница 38: ...38 ...
Страница 39: ...39 ...
Страница 48: ...48 ...
Страница 67: ...67 This page intentionally left blank ...