34
Bend-Tech Dragon A250
Assembly Manual
Cables and Control Box
06
6.3 Routing Cables
With the cables fed through the
hole in the cable track tray, place
the three 1 ½ in. cable loops from
Fastener Bag No. 4 around the
cables at even intervals between
the hole and the area just above the
control box.
Secure the cable loops along the
center of the Rail Beam using the
T-Nuts and screws in Fastener Bag
No. 4. Tighten securely to the side
of the Rail Beam.
6.4 Connect to Control Box
With the cables routed along the Rail Beam, insert the cables in their appropriate connections
at the Control Box. Both the cables and the Control Box will be clearly labeled. Tighten
securely by hand.
Cable Track Tray
Hole for Cables
Cable Track
Содержание Dragon A250 Series
Страница 1: ...A250 Part 1 of 1 Assembly Manual Revision 1 English 2020 Bend Tech LLC ...
Страница 30: ...30 Bend Tech Dragon A250 Assembly Manual Leveling and Alignment 04 ...
Страница 36: ...36 Bend Tech Dragon A250 Assembly Manual Cables and Control Box 06 ...
Страница 38: ...38 Bend Tech Dragon A250 Assembly Manual Air Line 07 ...
Страница 42: ...42 Bend Tech Dragon A250 Assembly Manual Torch 08 ...
Страница 43: ...Attention After completing the Dragon A250 assembly please proceed to Startup and Training Manual Part 1 ...
Страница 44: ...Bend Tech LLC 729 Prospect Ave Osceola WI 54020 1 651 257 8715 sales bend tech com www bend tech com ...