
53
Bell
fi res
Installation instructions
Do not cover the top side of the
appliance with (built-in) materials.
DO NOT COVER
BUILDING IN / HANGING OF THE APPLIANCE
Checking the gas connection
After connection of the gas supply, check once again that all connections are completely
gas tight using soapy water or a leak tester.
Built-in appliance:
Once the fi replace has been fi nished, you can now, fi t the frame with the small door to
the operating unit.
Depending of enclosure: After installation in a new fi replace and/or applying new
cement work, the appliance cannot be used for at least four weeks.
Содержание VIEW BELL TOPSHAM 3 LF
Страница 2: ......
Страница 4: ...4 Bellfires Installation instructions ...
Страница 74: ...74 Bellfires Installation instructions DIMENSIONS VIEW BELL VERTICAL 3 Hidden Door Built in model ...
Страница 76: ...76 Bellfires Installation instructions OPERATING UNIT Dimensions in inches 9 7 12 4 11 3 2 14 ...