
Assembly and wiring
Technical manual LioN-P PROFINET IO-Link Master
Release 2.0 04/2017
5.3 Port assignments
29
5.3.2
Power supply with M12 power L-coded
Color coding: gray
Figure 2: Schematic diagram of the M12 L-coding (connector), port X03 (IN)
Figure 3: Schematic diagram of the M12 L-coding (socket), port X04 (OUT)
Power supply
Pin
Signal
Function
1
U
s
(+24V)
Sensor/system power supply
2
GND_U
Aux
Ground/reference potential U
aux
3
GND_U
s
Ground/reference potential U
s
4
U
Aux
(+24V)
Auxiliary supply
(electrically isolated)
5
FE (PE)
Functional ground
Table 4:
Power supply with M12--Power
NOTE
Only use power supply units for the system/sensor and actuator supply that
correspond to PELV (Protective Extra Low Voltage) or SELV (Safety Extra
Low Voltage). Power supplies according to EN 61558-2-6 (transformers) or
EN 60950-1 (switching power supply units) fulfill these requirements.
Содержание 934 840 001
Страница 2: ...2 Technical manual LioN P PROFINET IO Link Master Release 2 0 04 2017...
Страница 6: ...Content 6 Technical manual LioN P PROFINET IO Link Master Release 2 0 04 2017...
Страница 14: ...Designations and synonyms 14 Technical manual LioN P PROFINET IO Link Master Release 2 0 04 2017...
Страница 34: ...Assembly and wiring 34 5 3 Port assignments Technical manual LioN P PROFINET IO Link Master Release 2 0 04 2017...