
Assembly and wiring
Technical manual LioN-P/ -R PROFINET
Release 1.2 02/2016
4.3 Port assignments
23
Figure 3: Schematic drawing, port X04 (OUT)
Port
Pin
Signal
Function
0980 ESL 801
0980 ESL 802
0980 ESL 803
Power supply
X03, X04
1
*see note
Actuator
GND (0V)
2
GND (0V)
System/sensors
GND (0V)
3
FE
Ground
Functional ground
4
+24 V
System/sensors
U
S
+24 V
5
*see note
Actuator
V
L
(+24 V)
Table 10: Assignment of ports X03, X04
NOTE
For the input module 0980 ESL 801, the two contacts 1 and 5 are not
required for the power supply to the actuators. However, these two contacts
are connected to each other on the connector and socket side to enable 5-
pin transmission of the power supply to a downstream module.
NOTE
Only use power supply units for the system/sensor and actuator supply that
correspond to PELV (Protective Extra Low Voltage) or SELV (Safety Extra
Low Voltage). Power supplies according to EN 61558-2-6 (transformers) or
EN 60950-1 (switching power supply units) fulfill these requirements.
NOTE
For modules with a 7/8" housing, use the power supply voltage "SELV and
Limited Energy".
Содержание 934 692-001
Страница 2: ...2 Technical manual LioN P R PROFINET Release 1 2 02 2016...
Страница 6: ...Content 6 Technical manual LioN P R PROFINET Release 1 2 02 2016...
Страница 10: ...About this manual 10 1 3 Version information Technical manual LioN P R PROFINET Release 1 2 02 2016...
Страница 26: ...Assembly and wiring 26 4 3 Port assignments Technical manual LioN P R PROFINET Release 1 2 02 2016...
Страница 62: ...Technical data 62 9 7 LEDs Technical manual LioN P R PROFINET Release 1 2 02 2016...
Страница 64: ...Declaration of conformity 64 Technical manual LioN P R PROFINET Release 1 2 02 2016...