Split-type room air conditioner / Installation Manual
57 / 120 EN
13
Information servicing
15. Removal and evacuation
When breaking into the refrigerant circuit to make repairs of for any other purpose conventional
procedures shall be used. However, it is important that best practice is followed since flammability is a
consideration. The following procedure shall be adhered to:
t
remove refrigerant;
t
purge the circuit with inert gas;
t
evacuate;
t
purge again with inert gas;
t
open the circuit by cutting or brazing.
The refrigerant charge shall be recovered into the correct recovery cylinders. The system shall be
flushed with OFN to render the unit safe. This process may need to be repeated several times.
Compressed air or oxygen shall not be used for this task.
Flushing shall be achieved by breaking the vacuum in the system with OFN and continuing to fill until
the working pressure is achieved, then venting to atmosphere, and finally pulling down to a vacuum.
This process shall be repeated until no refrigerant is within the system.
When the final OFN charge is used, the system shall be vented down to atmospheric pressure to enable
work to take place. This operation is absolutely vital if brazing operations on the pipe-work are to take
place.
Ensure that the outlet for the vacuum pump is not closed to any ignition sources and there is
ventilation available.
16. Charging procedures
In addition to conventional charging procedures, the following requirements shall be followed:
t
Ensure that contamination of different refrigerants does not occur when using charging equipment.
Hoses or lines shall be as short as possible to minimize the amount of refrigerant contained in them.
t
Cylinders shall be kept upright.
t
Ensure that the refrigeration system is earthed prior to charging the system with refrigerant.
t
Label the system when charging is complete (if not already).
t
Extreme care shall be taken not to overfill the refrigeration system.
t
Prior to recharging the system it shall be pressure tested with OFN. The system shall be leak tested
on completion of charging but prior to commissioning. A follow up leak test shall be carried out prior
to leaving the site.
17. Decommissioning
Before carrying out this procedure, it is essential that the technician is completely familiar with the
equipment and all its detail. It is recommended good practice that all refrigerants are recovered safely.
Prior to the task being carried out, an oil and refrigerant sample shall be taken.
Содержание BEHPI 090
Страница 2: ......
Страница 52: ...52 120 EN Do not C 11 ...
Страница 60: ......
Страница 110: ...110 120 SI ne Ob nakupu nove naprave bo prodajalec brezplačno prevzel staro napravo C 11 ...
Страница 118: ......
Страница 119: ......
Страница 120: ...www beko com ...