Installation
2
Installation
2.1 Space Requirements
•
Maximum installation plate thickness: 11 mm
•
Space requirements when installing the operator panel:
100 mm
100 mm
145 mm
104 mm
50 mm
50 mm
43 mm
100 mm
Caution:
The openings on the enclosure are for air convection. Do not cover these openings.
Beijer Electronics, MAEN015A
6