DxC Integrated Workstation In-Lab Training Manual
Page 37 of 101
Rev. A (June 2014)
Beckman Coulter Professional Development
DxC Integrated Workstation Daily Start Up
No
No
No
No
No
Yes
Yes
Yes
Yes
Print/View Integrated Workstation supply, reagent, and calibration status
Load DxI supplies
Perform the following DxI Daily Maintenance procedures (Utility Assay enabled):
~ Check System Backup
~ Shake Solid Waste Container
~ Run DxI Clean Routine
~ Initial and Date Electronic Maintenance Log
Load UCTA supplies
Load DxC reagents
Calibrate DxC chemistries
Process Quality Control
Calibrate DxI assays
UCTA
supplies
required?
DxC
calibration
required?
DxI
calibration
required?
DxC
reagents
required?
Yes
Clear racks
DxI
supplies*
required?
*Note: DxI
supplies can be
loaded while the
Clean Routine is
processing, except
when changing the
Solid Waste.