DxC Integrated Workstation In-Lab Training Manual
Page 54 of 101
Rev. A (June 2014)
Beckman Coulter Professional Development
Calibrate DxC Chemistries
No
Yes
Select
Rgts/Cal
from the workstation console
Review the calibrator load list. Verify the
calibrator lot number in use matches the load list
Note: For some calibrators, the lot number is N/A
Press the
RUN
button on the UCTA.
Locate the racks to be used for calibration. Pour
the calibrator(s) into sample cups and place the
sample cups in either the assigned bar code
labeled tube(s) or the assigned calibrator rack
number and position
Place the rack(s) in the UCTA load tray
Select
Cal F4
Select
List F5
When Calibration is complete view calibration
status on Rgts/Cal screen
Calibration
successful?
Consult references
for troubleshooting
assistance
Procedure complete
Select each chemistry for calibration.
Page down to view additional chemistries
Select the
DxC
tab