Commissioning
EM7004
41
Version: 2.0
Fig. 40: Choose target system (remote)
In this sample "Runtime system 1 (port 801)" is selected and confirmed. Link the PLC with the real-time
system via menu option "Online" → "Login", the F11 key or by clicking on the symbol
. The control
program can then be loaded for execution. This results in the message "No program on the controller!
Should the new program be loaded?", which should be acknowledged with "Yes". The runtime environment
is ready for the program start:
Содержание EM7004
Страница 2: ......
Страница 23: ...Mounting and wiring EM7004 23 Version 2 0 Fig 18 Other installation positions...
Страница 59: ...Commissioning EM7004 59 Version 2 0 Fig 68 TCP IP setting for the Ethernet port...
Страница 69: ...Commissioning EM7004 69 Version 2 0 Fig 86 EtherCAT terminal in the TwinCAT tree left TwinCAT 2 right TwinCAT 3...