Commissioning
EL28xx-xxxx
90
Version: 2.2
Fig. 69: PLC Control logged in, ready for program startup
The PLC can now be started via "Online" → "Run", F5 key or
.
5.1.2
TwinCAT 3
Startup
TwinCAT makes the development environment areas available together with Microsoft Visual Studio: after
startup, the project folder explorer appears on the left in the general window area (cf. "TwinCAT System
Manager" of TwinCAT 2) for communication with the electromechanical components.
After successful installation of the TwinCAT system on the PC to be used for development, TwinCAT 3
(shell) displays the following user interface after startup:
Содержание EL28 Series
Страница 1: ...Documentation EL28xx xxxx Digital HD Output Terminals 2 2 2019 01 03 Version Date...
Страница 2: ......
Страница 72: ...Mounting and wiring EL28xx xxxx 72 Version 2 2 Fig 48 Other installation positions...
Страница 106: ...Commissioning EL28xx xxxx 106 Version 2 2 Fig 95 Incorrect driver settings for the Ethernet port...
Страница 117: ...Commissioning EL28xx xxxx 117 Version 2 2 Fig 114 EtherCAT terminal in the TwinCAT tree left TwinCAT 2 right TwinCAT 3...