Commissioning
EL28xx-xxxx
98
Version: 2.2
Fig. 82: Sample program with variables after a compile process (without variable integration)
The control program is now created as a project folder, followed by the compile process:
Fig. 83: Start program compilation
The following variables, identified in the ST/ PLC program with "AT%", are then available in under
"Assignments" in the project folder explorer:
Assigning variables
Via the menu of an instance - variables in the "PLC” context, use the "Modify Link…" option to open a
window for selecting a suitable process object (PDO) for linking:
Содержание EL28 Series
Страница 1: ...Documentation EL28xx xxxx Digital HD Output Terminals 2 2 2019 01 03 Version Date...
Страница 2: ......
Страница 72: ...Mounting and wiring EL28xx xxxx 72 Version 2 2 Fig 48 Other installation positions...
Страница 106: ...Commissioning EL28xx xxxx 106 Version 2 2 Fig 95 Incorrect driver settings for the Ethernet port...
Страница 117: ...Commissioning EL28xx xxxx 117 Version 2 2 Fig 114 EtherCAT terminal in the TwinCAT tree left TwinCAT 2 right TwinCAT 3...