background image

 

 

Installation Instructions 

Document No. 545-404 

December 17, 2003 

 

Termination Block 

 

 

Item Number: 545-404-06, Rev. 010

 

Page 1 of 2 

Product Description 

The Point Termination Module (PTM) consists of a 
termination block and an electronic point module.  

The termination block provides the wire connection 
between the Modular Building Controller (MBC) or 
Remote Building Controller (RBC) and the field input 
or output device.  

These procedures apply to termination block 
installation only. See Installation Instructions 
(545-405) for point module installation.  

Product Numbers 

Termination block part numbers end with an H or L 
to indicate high or low voltage.  

PTX6.H  Replacement High Voltage Termination 

Block 

PTX6.L  Replacement Low Voltage  

Termination Block 

See Installation Instructions (545-406) for the 
Replacement AO-P Termination Block (545-020) 

Caution Notation 

CAUTION:   

 

Equipment damage or loss of 
data may occur if you do not 
follow the procedures as 
specified. 

Required Tools 

• 

None 

Expected Installation Time 

3 minutes per termination block (not including wiring) 

Prerequisites 

• 

MBC/RBC installed. 

• 

Job layout sheet. 

• 

A high/low voltage wire barrier may be 
required by local codes. See Figure 1 and 
Installation Instructions (545-420). 

Installations Requiring CE Compliance 
or the Equivalent 

All termination block wiring must be twisted, shielded 
pair cable. Follow the normal specification for BLN 
and FLN network cables in the APOGEE Automation 
Configuration and Sizing Guidelines 
on InfoLink.  

Any permanently installed MMI cables must be 
shielded cabling. 

1.  Locate one or more acceptable locations for 

terminating the shields of the I/O and MMI cables: 

• 

The mounting studs of the backplane, or any 
location that is both earth grounded and 
within 15 cm (6 inches) of the backplane, 
are acceptable. 

• 

If the backplane studs are not used, the 
ground must be terminated directly to the 
cabinet using self-tapping screws. 

2.  Peel back the insulation of the I/O cables to expose 

the correct length of shield and terminate the shield 
at the proper ground locations. 

 

Figure 1.  Termination Blocks Installed in MBC. 