C1120 S5 to II/O Lightbus Interface
Beckhoff II/O-Lightbus System
Date 27.06.97
Version 2.1
Page 43 of 52
F6
OPEN PROJECT
Loads a project from the actual directory.
F7
MAKE PROJECT
generates a new project in the actual directory.
F8
DELETE PROJECT
deletes a project from the actual directory.
F9
COPY PROJECT
Copies a project from the actual directory to any path and/or directory.
F10 PREVIOUS MENU
returns to master setup menu.