BEAR | 2017 |
page 12
6.1. Prior to the start of the water still, it should be connected to the water supply system
through the pipe 7 (Figure 3) and you should wait until water runs from the cooling
water drain pipe 12, to which the cooling water removal hose is connected. The nozzle
9 automatically controls the water flow rate.
6.2. When the power switch 2 is switched ON (the switch is lit when in ON position), the
automatic controller switches the electric heater 3.
6.3. Raw water boils in the evaporator 10, steam forms and is separated and fed into the
condenser 6. Steam condenses on the condenser walls and in the heat exchanger with
formation of distilled water. The equalizer maintains the water level in the evaporator
due to water overflow in the drain pipe
6.4. Distillate flows out through the distillate drain pipe 5. Additional containers should be
used to collect distillate.
7. Before installation
Installation of the equipment must be done only by qualified personnel
and only after reading this operating manual
7.1.
The water distillers are designed for table mounting and should be placed on a solid
and flat surface. Use level and adjustable foots to place water distiller.
7.2.
Water distillers should be installed in rooms with water supply
system, water supply control valve, sewage system, electric
network with grounding. Do not use the water distillers without
connecting its grounding terminal to the protective grounding
bus.
7.3. During the operation, the water distiller produces gases, as well as steam and heat
from raw water, because of this, it is reasonable to have sufficient natural ventilation or
exhaust ventilation in the premises.
7.4. Raw water incoming pressure should be 0.15-0.5 MPa. Otherwise, the stable water
distiller operation is not guaranteed.
7.5.
Prior to the connection of the water distiller to mains, check visually the cord,
breaker for any signs of defectiveness.