background image

BEAR | 2017 | 

page 3

Operation safety:

Water distiller is based on water evaporation method. Due to that fact, 
it heats water up to boiling temperature. Be careful with water distiller 
surfaces and distillated water – they can be extremely hot.
Never open working distiller. Before any maintenance make sure that 
water distiller has cooled down.

 

Water distillers with built in tank (models BEAR B 1104, BEAR B 1110, BEAR B 1125) are 
equipped with automatic control system and will automatically switch off if tank is full. 
Nevertheless, water distiller is a powerful electric equipment that works with liquids and it 
must be periodically observed by personnel while operating. 

 

Water distillers without built in tank (models BEAR B 1204, BEAR B 1210) are not equipped 
with automatic control system and must be controlled by personnel all the time while 
operating. Make sure that distillate receptacle is big enough and not full, before starting 
operation.

2. General information

2.1.  Water distillers

 

BEAR B 1104

 

BEAR B 1110

 

BEAR B 1125

 

BEAR B 1204

 

BEAR B 1210 (hereinafter referred to as water distillers)

 

are electric single(mono)-distillation water distillers designed for produc-
ing distilled water for laboratory and other use. Water distillers differ in 
capacity and features, depending on model.

2.2.   Water distillers are designed to work either with single phased 120 V or 3-phased 200-

220 VAC electric network  (for USA, Canada, Mexico and other countries with corre-
sponding voltage standards)

2.3.   Water distillers power consumption, not more than:

 

 1.5 kW – BEAR B 1104, BEAR B 1204 (3 kW modifications are also avail-
able)

 

7.5 kW – BEAR B 1110, BEAR B 1210

 

18 kW – BEAR B 1125

2.4.   Water distiller’s capacity at rated mains voltage, not less than

 

0.5 gallon of distillate per hour – BEAR B 1104, BEAR B 1204 (1 gallon in 

Содержание A 1104

Страница 1: ...Water Distillers OPERTION MANUAL A 1104 A 1110 A 1125 A 1204 A 1210...

Страница 2: ...ke modifications to the design of the water distiller Be careful water distiller surfaces and distillate can be extremely hot while operating Use only original accessories and parts heaters valves con...

Страница 3: ...controlled by personnel all the time while operating Make sure that distillate receptacle is big enough and not full before starting operation 2 General information 2 1 Water distillers BEAR B 1104 BE...

Страница 4: ...Due to heaviness of BEAR B 1110 and BEAR B 1125 those models should be unpacked by 2 persons For BEAR B 1110 and BEAR B 1125 the easiest way is to disassemble the wooden crate and then remove the pal...

Страница 5: ...n hose inlet hose length 2 meters 1 Water connection hose drain hose length 1 5 meters 16x25 mm 2 Fitting with male thread 12 mm 2 Silicone tube for constant distillate withdrawal 15x3 mm length 1 met...

Страница 6: ...1 Fitting with male thread 12 mm 1 Metal water connection hose inlet hose length 1 5 meters 1 Water connection hose drain hose length 1 5 meters 2 Silicone tube for constant distillate withdrawal 16x2...

Страница 7: ...ler design the structure component view is schematic not taking into considera tion features of the water stills Figure 2 shows the fitting grounding terminal connection diagram 4 Water distiller with...

Страница 8: ...changer inlet 16 Evaporator inlet 17 Heater 18 Equalizer drain pipe 19 Heat exchanger 20 Condenser drain pipe 21 Raw water supply valve 22 Collector distillate level pipe 23 Evaporator top level senso...

Страница 9: ...vaporator 2 steam forms then separated and enters in the condenser 6 via the channel 5 The separator consists of the steam floe splitter 3 and the nozzle 4 located inside the channel 5 4 4 Steam conde...

Страница 10: ...utomatic device switches the heater OFF at the same time the switch led HEATER turns off 5 5 The Low water thermostat sensor 10 Figure 1 ensures an additional emergency shut down of the water still in...

Страница 11: ...sideration features of the water stills 6 Water distiller without built in tank design and principle of operation 1 Housing 2 POWER switch 3 Electric heater s 4 Low water thermostatic sensor 5 Distill...

Страница 12: ...ld be used to collect distillate 7 Before installation Installation of the equipment must be done only by qualified personnel and only after reading this operating manual 7 1 The water distillers are...

Страница 13: ...IGH WATER LEVEL red LED will light up 8 6 Install gaskets in the filling hose nuts if they ar not pre installed at the factory 8 7 Connect the filling hose to the fitting 25 Figure 2 8 8 Connect the f...

Страница 14: ...14 Connect the water still grounding terminal to the PG bus with flexible copper wire at least 6 mm2 in cross section Connect the external circuits to the power supply network in accordance with Figur...

Страница 15: ...re Equalizer is about 70 80 degrees Celsius 9 5 Install water distiller on the table using the level gauge and avoiding slants 9 6 Attach the silicone tube L 0 5 m to the distillate drain pipe 5 9 7 C...

Страница 16: ...s an overflow of water and turn off the water still and the HIGH WATER LEVEL LED will be lit 10 7 To start the water distiller push the POWER button located on the front panel and this button should b...

Страница 17: ...d down and then push the lock button located on the thermal switch housing Pos 13 Figure 5 11 6 To start the water still push the POWER button located on the front panel and this but ton should be lit...

Страница 18: ...splitter 3 Figure 1 12 6 6 Remove the steam flow splitter 3 12 6 7 Flush with water the walls and bottom of the evaporator to remove salt con taining sediments You can use the filling hose for supplyi...

Страница 19: ...12 6 28 Make sure that the sensors 9 23 Figure 1 is rigidly fixed and do not contact the walls 12 6 29 Assembly the water still performing steps 4 3 in reverse order 12 6 30 The water still can be use...

Страница 20: ...evaporator with water add cleaning solution for descaling Close the raw water supply valve Bring to a boil and boil for 10 20 minutes Then after 60 minutes drain the solution 13 5 Rinse with water an...

Страница 21: ...ARS Guarantee mentioned above is limited for the heaters for 6 months 16 2 Service Maintenance of the distillers should be performed by qualified personnel Distiller serial number_____________________...

Страница 22: ...Contact Info Location 5115 Douglas Fir Road Suite G Calabasas California 91302 USA Phone 424 259 0816 E mail info bearinnovation com...

Отзывы: