8
Manual Manifold
2006230.03
2. Installation
2.1 Installation procedure for
Panel
CAUTION: Ensure no contaminates, oil
or grease come into contact with any of the gas
connection/internals.
2.1.1 Unpack and inspect all items for damage.
2.1.2 Check wall for suitability.
CAUTION: Supplied fixings are for use with
solid masonry walls only. Alternative fixing types
are not suppled with the unit. For securing to
alternative wall types, ensure that wall structure and
Figure 3 - Typical Installation For Use With ‘J’ & ‘G’
Type Cylinder
Note - ‘J’ type cylinders typically for Oxygen and Medical Air.
‘G’ type cylinders typically for Nitrous Oxide and N2O/O2 mix
(Entonox).
CAUTION: Supplied fixings are for use with
solid masonry type walls only. Typical panel weight
is 15kg.
selected fasteners are suitable for supporting
the typical 15 kg weight of the panel.
2.1.3 Identify the centre position of the control
panel on the wall and mark.
2.1.4 Check
figure 3 & 4
for typical mounting
heights and mounting hole details. Drill wall and fit
wall plugs. Screw the panel to the wall, checking
that it is firmly attached.
2.1.5 Loosely connect the supplied ø22mm OD
stub pipe to the main pipeline isolation valve (
Item
9, figure 1)
. Do not fit the O’ring seal till after
brazing is complete to prevent damaging the seal.
Note - If option high pressure bank valves are used (see
figure 1, item 14) the manifold width increases by 110mm
per side.
Note - Image
shows
optional
exhaust and
terminal
box.