44 45
E
The hole for the drainage pipe must be drilled using a
20mm Drill bit.
Ensure the hole is at a downward angle
(min 5 degrees) so that the water will drain correctly.
Use a 180mm core drill to drill the two holes for the units
ventillation, ensuring that both the holes are aligned with
the template.
Use the template to mark the position of the screws for
the hanging rail, using a spirit level to ensure it is straight
and level.
Drill the marked holes using a suitable 8mm drill bit and
insert wall plugs.
Line the hanging rail with the holes, and fix the rail into
position using the supplied screws.
Ensure that the hanging rail is securely fastened onto the
wall, and that there is no risk of the unit tipping or falling.
Roll the plastic vent sheets into a tube
and feed them from the inside into the
holes previously made. Ensure the
tubes sit flush to inside the wall.
Содержание BC10MBKL2101F
Страница 1: ...MONOBLOCK KLIMAGER T BC10MBKL2101F AIR CONDITIONER BC10MBKL2101F GEBRAUCHSANWEISUNG OPERATOR S MANUAL...
Страница 32: ...TECHNISCHE ZEICHNUNG MODELL BC10MBKL2101F...
Страница 35: ...34 35 D...
Страница 66: ...TECHNICAL DRAWING MODEL BC10MBKL2101F...
Страница 69: ...68 69 E...
Страница 70: ...NOTE...
Страница 71: ...70 71 E NOTE...
Страница 72: ...Schuss Home Electronic GmbH Scheringgasse 3 A 1140 Wien Tel 43 1 97 0 21 0...