46 47
E
Lift the unit onto the wall, align the hanging
holes with the hooks on the hanging rail and
gently rest the unit into place. At the same
time, slide the drain pipe through the drainage
hole.
NOTE:
1st: please ensure that the backside of product
is tightly attached on the wall to avoid additional
vibration and noise.
2nd : The end of the external water pipe must be
placed in an open space or drain. Avoid damage
or constriction to the drainage pipe to ensure the
unit drains.
Fixed plate
4x10 tapping screw
Содержание BC10MBKL2101F
Страница 1: ...MONOBLOCK KLIMAGER T BC10MBKL2101F AIR CONDITIONER BC10MBKL2101F GEBRAUCHSANWEISUNG OPERATOR S MANUAL...
Страница 32: ...TECHNISCHE ZEICHNUNG MODELL BC10MBKL2101F...
Страница 35: ...34 35 D...
Страница 66: ...TECHNICAL DRAWING MODEL BC10MBKL2101F...
Страница 69: ...68 69 E...
Страница 70: ...NOTE...
Страница 71: ...70 71 E NOTE...
Страница 72: ...Schuss Home Electronic GmbH Scheringgasse 3 A 1140 Wien Tel 43 1 97 0 21 0...